Preliminary Acid Sulphate Soil Management Plan
Noosa on Weyba
Table of Contents
1 Introduction 5
1.1 Purpose 5
1.2 Implementation 5
1.3 Background 5
2 Desktop investigation 6
2.1 Description of Works 6
2.2 Site Features 6
2.3 Mapping 7
3 Previous Investigation 10
4 Further Investigation 11
4.1 Sampling Intensity 11
4.2 Locations 11
4.3 Depths 11
5 Borehole Analysis 12
5.1 Field Analysis – pHF and pHFOX 12
5.2 Laboratory Analysis – Suspension Peroxide Combined Acidity and Sulphur (SPOCAS)
Method 12
6 Assessment of Results 13
6.2 Level of Treatment 14
7 Acid Sulphate Soil Management Plan 15
7.1 Assessment of Management Issues 15
7.2 Responsible Party 16
7.3 Policy 16
7.4 Performance Objectives 16
7.5 Site Preparation 16
7.6 Staff Training - Site Induction 16
7.7 Storage of Lime on Site 16
7.8 Site Drainage 16
7.9 Transportation 16
7.10 Earthworks 17
7.10.1 Excavated Materials 17
7.10.2 Fill Areas 17
7.11 Neutralisation 17
7.11.1 Treatment Area Preparation 17
7.11.2 Excavated Materials 17
7.12 Dewatering 18
7.13 Filling 19
7.14 Stockpiling 19
7.15 Monitoring 19
7.16 Validation 21
7.17 Contingency 21
8 References 22
10 October 2013 Cardno iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8- Amended Engineering Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.