Council archive · source document
Attachment 8- Amended Engineering Report MCU12/0208
Very large file (61.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 80, section 1. The text section number identifies this passage in the reader.
Preliminary Acid Sulphate Soil Management Plan
Noosa on Weyba
Appendices
Appendix A Figures and Drawings
Tables
Table 2-1 Assessment of Geomorphic and Site Criteria 7
Table 2-2 Land Assessment of Geomorphic and Site Criteria 9
Table 4-1 Land Assessment of Geomorphic and Site Criteria 11
Table 6-1 Action Criteria from QASSIT Guidelines 13
Table 6-2 Treatment Categories and Liming Rates (Sources from QASSIT Guidelines) 14
Table 7-1 Assessment of Disturbances 15
Table 7-2 Release Criteria for Stored Waters (all site water including dewatering and sediment basins) 18
Table 7-3 Summary of Monitoring, Testing and Reporting 20
Table 7-4 Frequency and Duration of Groundwater Monitoring and Reporting 21
Table 7-5 Non Compliance Responses 21
10 October 2013 Cardno iv
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8- Amended Engineering Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.