Preliminary Acid Sulphate Soil Management Plan
Noosa on Weyba
4 Further Investigation
The previous investigations undertaken by Cardno Bowler, and the desktop study indicate that further
investigation of the site will be required and a detailed Acid Sulphate Soils Management Plan be prepared.
This detailed plan will be prepared once the nature and extent of the works in each area has been
deteremined, and the locations of the further testing required can be accurately provided. Outlined below are
the sampling requirements of the Guidelines for Sampling and Analysis of Lowland Acid Sulphate Soils
(QASSIT, 1998).
4.1 Sampling Intensity
The QASSIT Guidelines outline the minimum number of boreholes for investigation depending on the site
area. This is reproduced in Table 4-1 below.
Table 4-1 Land Assessment of Geomorphic and Site Criteria
Area of Site Minimum Number of Sampling Holes
Up to 1 ha 4 holes
1-2 ha 6 holes
2-3 ha 8 holes
3-4 ha 10 holes
>4 ha 2 holes/ha
As the proposed precincts for the site are generally greater than 4 hectares, 2 holes per hectare will be
require across the proposed development.
4.2 Locations
The locations of boreholes are to be determined based on the final development layout and the earthworks
required across the site.
4.3 Depths
Soil samples are to be recovered at 0.25m depth intervals in each of the boreholes to a minimum of 2m or
1m below the depth of any proposed earthworks. As with the locations, the depths of each borehole will be
specified in the detailed Acid Sulphate Management Plan, when greater detail regarding the proposed
development is known.
10 October 2013 Cardno 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8- Amended Engineering Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.