Attachment 1B - Approval 2006-2237 - Stage 2B
Attached to the e-mail MCU16/0075 Development Application - 90 Beach Road Noosa North Shore.
2006/2237
4 CONSOLIDATED ASSESSMENT MANAGER CONDITIONS
Land Use
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are:-
1.1. Stage 2 Construction Zone Plan numbered C589-23 Issue E prepared by Wolter
Consulting Group and undated;
1.2. Stage 2 Tree Clearing Plan numbered 50610 Drawing 1 of 1 Issue B prepared by
Terrain Consultants and dated March 2007;
1.3. Lot 25 – 50302B/25/01 to 50302B/25/08 Issue DA prepared by Gall & Medek Architects
Pty Ltd and dated 29 September 2006;
1.4. Lot 26 – A-DA-01 to A-DA-13 Revision A prepared by Deicke Richards Architecture and
dated September 2006;
1.5. Lot 27 – 100-00 Revision 4, 100-01 Revision 1, 100-02 Revision 1, 200-00 Revision 5,
200-01 Revision 5, 210-00 Revision 1, 300-00 Revision 4, 300-01 Revision 4, 300-02
Revision 4, 300-03 Revision 4, 400-00 Revision 1 prepared by Arkhefield and dated 16
October 2006;
1.6. Lot 28 – 50302B/28/01 to 50302B/28/10 Issue DA prepared by Gall & Medek Architects
Pty Ltd and dated 29 September 2006;
1.7. Lot 29 – SK-1 to SK-9 Issue A prepared by John Cameron Architect and dated 29
September 2006;
1.8. Lot 30 – A30-1.00 dated 31 March 2006, A30-1.01 dated 31 March 2006, A30-1.10
dated 5 May 2006, A30-1.11 dated 5 May 2006, A30-2.01 dated 31 March 2006, A30-
2.02 dated 31 March 2006, A30-2.03 dated 31 March 2006, A30-3.01 dated 31 March
2006, A30-3.02 dated 31 March 2006, A30-3.03 dated 31 March 2006, A30-3.04 dated
31 March 2006, A30-4.01 dated 31 March 2006 Issue 01 and prepared by Planit
Architecture & Management;
1.9. Lot 31 – A31-1.00 dated 31 March 2006, A31-1.01 dated 31 March 2006, A31-1.10
dated 5 May 2006, A31-1.11 dated 5 May 2006, A31-2.01 dated 31 March 2006, A31-
2.02 dated 31 March 2006, A31-2.03 dated 31 March 2006, A31-3.01 dated 31 March
2006, A31-3.02 dated 31 March 2006, A31-3.03 dated 31 March 2006, A31-3.04 dated
31 March 2006, A31-4.01 dated 31 March 2006 Issue 01 and prepared by Planit
Architecture & Management;
1.10. Lot 32 – 32, 32-1 to 32-13 Issue DA prepared by Bark Design Architects and dated 19
September 2006;
1.11. Lot 33 – A-DA-15 to A-DA-28 Revision A prepared by Deicke Richards Architecture and
dated September 2006;
1.12. Lot 34 – 100-00 Revision 4, 100-01 Revision 1, 100-02 Revision 1, 200-00 Revision 5,
200-01 Revision 5, 200-02 Revision 5, 210-00 Revision 1, 300-00 Revision 4, 300-01
Revision 4, 300-02 Revision 4, 300-03 Revision 4, 400-00 Revision 1 prepared by
Arkhefield and dated 16 October 2006;
1.13. Lot 35 – A35-1.00 dated 31 March 2006, A35-1.01A dated 24 January 2007, A35-1.10
dated 5 May 2006, A35-1.11 dated 5 May 2006, A35-2.01 dated 31 March 2006, A35-
2.02 dated 31 March 2006, A35-2.03 dated 31 March 2006, A35-3.01 dated 19 April
2006, A35-3.02 dated 19 April 2006, A35-3.03 dated 19 April 2006, A35-3.04 dated 19
April 2006, A35-4.01 dated 31 March 2006 Issue 01 and prepared by Planit Architecture
& Management;
Page 2 of 17
Print Date: 24 April 2015, 3:55 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 1B - Approval 2006-2237 - Stage 2B.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.