Original source · versioned page text
Attachment 1B - Approval 2006-2237 - Stage 2B
Attached to the e-mail MCU16/0075 Development Application - 90 Beach Road Noosa North Shore.
2006/2237
47.2 Samples for chemical analysis shall be taken prior to occupation the units and Leisure
centre and thereafter annually, if any parameters are above drinking quality guidelines.
47.3 Samples for bacteriological analysis shall be taken prior to occupation and thereafter at
12 months intervals, with results forwarded to Council.
47.4 Should the results show non-compliance with the NHRMC guidelines to the detriment of
human health, immediate action is to be taken to make the water safe to drink.
Protecting the supply
47.5 Installation of gutter guard, first flush or other suitable methods to reduce entry of
organic matter and dust.
47.6 The installation of mosquito control screening on all tank inlets and discharge pipes.
Maintenance of the water infrastructure
47.7 A program for the regular servicing of any equipment installed.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Clearing native Concurrence Department of Ecoaccess Customer
vegetation Environment and Service Unit
Resource PO Box 15155
Management CITY EAST QLD 4002
Please refer to the Change to Existing Approval dated 30 January 2009 for a copy of any referral
agency responses prior to this application.
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the Assessment
Manager conditions.
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The applicant is informed that payment via credit card transaction will not be an acceptable
method of payment for development contributions conditioned in this permit or for
infrastructure charge notices issued separately.
2. The applicant is advised that a Compliance Permit for all potable water supply, recycled water,
plumbing and drainage works within the boundaries of the development site shall be obtained
from Council’s Plumbing Services Section prior to obtaining a Development Permit for Building
Works. Separate water supply and sewerage hydraulic drawings shall be submitted detailing
all internal plumbing installations for water and sewer house drainage for approval, as part of
the building application process, and in accordance with the Plumbing and Drainage Act 2002.
3. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
the cost of operational works exceeds $80,000, then a portable long service leave levy is
required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
the approved form issued by the Building and Construction Industry (Portable Long Service
Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
declaration outlining the cost of the operational works must be submitted to Council with the
lodgement of any application for operational works over the site.
Page 9 of 17
Print Date: 24 April 2015, 3:55 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 1B - Approval 2006-2237 - Stage 2B.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.