Original source · versioned page text
Decision Notice - DBW23 0101 [As Published]
Currency Period
2. This development approval lapses if the works have not substantially started by 17 October
2025, unless an application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
Sheet No. 2 of 10 - Proposed Additional Bedroom & Living 30 May 2023
Area, prepared by Accolade Building
Designs
Sheet No. 3 of 10 - Proposed Additional Bedroom & Living 30 May 2023
Area, prepared by Accolade Building
Designs
Sheet No. 4 of 10 - Proposed Additional Bedroom & Living 30 May 2023
Area, prepared by Accolade Building
Designs
Sheet No. 5 of 10 - Proposed Additional Bedroom & Living 30 May 2023
Area, prepared by Accolade Building
Designs
- - Applicant markup provided in support of 15 September
application (annotated by Council) 2023
Car Parking
4. A minimum of 1 car parking spaces must be provided on site and made available and
accessible at all times for residents of the secondary dwelling.
Lighting Amenity
5. No flood lighting must be used on site. Any vertical illumination resulting from direct, reflected
or other incidental external lighting emanating from the site must not exceed 8 lux when
measured at any point 1.5 metres outside the boundary and at any level from ground level
upward.
Environment
6. Sediment or any other material including building materials or waste products must not be
deposited or released into the road reserve, stormwater drain or adjacent properties.
Landscaping Works
7. Existing trees on the site must be retained, except where required to be removed to
accommodate the approved dwelling.
8. Existing vegetation in the road reserve must be retained, unless written authorisation from
Council is granted for the clearing.
9. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared
d. using low impact construction techniques around vegetation.
Page 2 of 5
Document Set ID: 22625874
Version: 4, Version Date: 19/10/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.