Original source · versioned page text
Decision Notice - DBW23 0101 [As Published]
Stormwater Drainage
10. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Damage to Services and Assets
11. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Geotechnical Stability
12. All works must be carried out in accordance with Arcos Group Geotechnical Investigation
Report 01 Revision A and dated 4 July 2023.s.
Waste Water Treatment and Disposal
13. The dwelling must be provided with an on-site waste water treatment and effluent disposal
system having a capacity sufficient for the use*.
*(Refer to Advisory Note)
Bushfire Management
14. An accessible dam, swimming pool or water tank (in addition to day to day water supply) with
an onsite water volume of not less than 5,000 litres must be available for firefighting
purposes, located within reasonable proximity to building.
15. A water supply outlet pipe 50 millimetres in diameter and fitted with a standard fire brigade
fitting must be connected to the water supply (other than where the water supply is in a
swimming pool or dam).
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
Wastewater Treatment and Disposal System
2. The wastewater treatment and disposal system for the site requires a Compliance Permit to
be obtained from Council under the Plumbing and Drainage Act 2002. The system must be
designed in accordance with the Queensland Plumbing and Wastewater Code (Department
of State Development and Infrastructure Planning, 2007) and Australian Standard AS/NZS
1547:2000 “On-site Domestic Wastewater Management” or an alternative solution approved
through Council’s Building and Plumbing Branch. Where a development exceeds the
accommodation or use of 21 or more equivalent persons a copy of an Operator’s License
from the relevant State will also be required.
Page 3 of 5
Document Set ID: 22625874
Version: 4, Version Date: 19/10/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original