Skip to the record
Accept no substitutions.

Original source · versioned page text

Info response

of 5

Page text shows just the words. Original shows the document exactly as it was published.

    9. Provide amended plans of the access driveway. The detail must be prepared
       by a suitably qualified person and include but not be limited to:
             a. levels and grades of the access driveway and the maneuvering areas;
             b. a longitudinal section extending from the centerline of the formation
                in Ross Cr to the basement garage;
             c. a driveway designed generally in accordance with Council’s standard
                drawings RS-049 and RS-050;
             d. demonstrate that a B99 vehicle will not bottom out or scrape
                entering/exiting the driveway;
             e. The necessary stormwater drainage structures.
    10. Considering all other carparks are occupied, demonstrate (by providing
        swept paths for each of the proposed carparks) that a B99 vehicle is able to
        park and leave the site with no more than 3 movements.

    11. Provide a preliminary Stormwater Management Plan for the site, including
        details of site levels and contours together with the collection and discharge
        of stormwater runoff from the building, the hardstand areas, the basement (a
        sump drain is proposed on the basement’s floor though no details of
        discharge are provided) and landscaped areas; and any required inter-
        allotment drainage and relevant easements.

    12. Provide details, prepared by a RPEQ (Registered Professional Engineer of
        Queensland), of the proposed earthworks, including, but not limited to:
        extents; volumes; existing and finished levels; cross-sections; batters
        and/or retaining structures; stabilisation methods proposed, etc.

Please find attached drawings from Recor Consulting Engineers demonstrating
compliance with the access driveway, manoeuvring, stormwater and earthworks details.



Pursuant to the Development Assessment Rules, the applicant has given the assessment
manager the information requested. Please proceed with your assessment of the
application at your earliest convenience.

If you have any further queries in relation to the above, please do not hesitate to contact
myself.

Regards,




Jack Lewis B.Sc Hons UNSW M.Plan Otago MPIA MQELA
Planner/Director
Pivotal Perspective Pty Ltd
0406 334 227




                                                                              Page 5 of 5
Log in to download the original file

Info response.pdf · 1.2 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.