Cc       9 Cardno
 3501-54                                         2                                  :
 13 June 2007

        Attenuation
        Cardno’s Surface Water Management Plan (8 February 2007) quantified the increase in
        impervious area on the site and the consequent potential increase in runoff. In order to mitigate
        this effect and prevent increased downstream flood risk, an attenuation basin was proposed for
        the south-west corner of the site. Some 1300m?® in volume, the basin was found, through a
        process of hydraulic modelling, to successfully attenuate stormwater flows from the site to rates
        lower than in the existing situation, for all events up to and including the 100 year average
        recurrence interval.
        External Catchments
        The site currently drains in a northerly direction. Sheet flow and minor ditches and gullies feed
        to an open drain at the northern boundary, which then flows westwards towards Gateway Drive.
        Flows then pass through a culvert under the road, before entering an open lake area, situated
        north of the existing retail area.
        The influence of external catchments on the site is limited. The site falls from the highest levels
        in the south east to its point of discharge in the north west.  It is bounded to the west by
        Gateway drive and a low-lying wetland corridor, to the south by the Eumundi Noosa Road, and
        to the east and north by an existing developed site. Levels to the west are lower than on site
        and fall to an area of wetland, but the other external catchments are examined in turn:
        South
        The Eumundi-Noosa Road follows the ridgeline of the hill, and levels fall away on the other side
        of the road to the south. It is not expected that the road itself will produce a significant amount
        of runoff, falling as it does to both the east and west (i.e. away from the site).
        East
        An existing developed site is situated to the east, and continues north of the subject site. It
        features a drainage network which runs south to north on the other side of the eastern boundary
        of the subject site. Based on a site inspection and discussions with the owner of the site, this
        line discharges northwards, away from the subject site. Three drainage manholes have been
        located and their invert levels recorded, and are shown on Figure 4.   Consequently, the site
        receives no runoff from the east.
        North — Adjacent Site Developed Area
        Flows from the developed area of the adjacent site to the north of the subject site are collected
        and discharged via a headwall towards, but not on, the subject site. Consideration will be given
        to this discharge at the detailed design stage and, if necessary, it will be routed to join the flows
        from the undeveloped area described below. The position of the two drainage manholes and
        the headwall are shown in Figure 4.
        North — Adjacent Site Undeveloped Area
        A small area of the adjacent site to the north appears undeveloped and contours indicate that it
        may drain back towards the subject site. The area, of approximately 1200m?, would produce
        approximately 80 litres per second of runoff in the 100-year event (using a conservative time of
        concentration of 10 minutes). Provision will be made along the northern boundary of the subject
        site to intercept these flows and convey them westwards to join flows from the subject site at the
        legal point of discharge.
        North — Subject Site Vegetated Area
        The proposed development extends as far as the existing premises to the north. This will leave
        an area of undisturbed vegetation that could potentially drain back towards the point of
        discharge.  Although approximately 2600m? in area, the time of concentration is likely to be
        considerable (calculated at 20 minutes), resulting in runoff of approximately 135 litres per
        second in the 100-year event.

J:\3501-54\WP\Letter Response to RFI.doc

Used in these records

About this file

File size
18.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E256.001.pdf · 18.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.