3501-54 3 Cc ) Cardno
13 June 2007
The combined external runoff to the point of discharge at the western boundary of the site would
therefore be 215 litres per second in the 100-year event. When compared to the attenuated
100-year flow from the site itself of over 600 litres per second (or over 1800 litres per second
before attenuation) these flows can be seen to be a modest and manageable part of the
detailed design process. Their influence on the discharge point would also be minimised by
their different time to concentration from the site itself, and it should be remembered that they
would feature as a constant in the hydraulic models for both the existi9ng and proposed
situations (effectively negating any affect).
“14, Provide Figure 4 from the Stormwater Quantity Section of the Cardno Surface Water
Management Plan.”
An updated Figure 4 is provided with this letter. Flow routes are shown conceptually at present,
and will be finalised at the detailed design stage. The roof of the Warehouse will connect to
rainwater tanks to serve the nursery. The majority of the car park area will be attenuated by a
detention basin (also featuring a bioretention device for quality treatment) and a smaller area
will discharge freely to the drain along the western border of the site. The capacity of the
detention basin is such that the combined discharges from the site (attenuated and
unattenuated) will be lower than existing in all events up to and including the 100-year average
recurrence interval.
Figure 4 has been updated since publication of the Surface Water Management Plan to include
the external flows described in the response to Item 13.
We trust that this letter provides a satisfactory response to the information request. If you have any
queries in relation to the response, please do not hesitate to contact us.
Yours sincerely
Martin Giles
Manager, Water Engineering
for Cardno
Enc: Figure 4a: Proposed Site and Conceptual Drainage Layout
Dwg No. 1, No. 2, and No. 3.
J:\3501-54\WP\Letter Response to RFI.docSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E256.001.pdfRelated documentPublic source context ↗
Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.