3501-54                                         3                          Cc       ) Cardno
 13 June 2007

        The combined external runoff to the point of discharge at the western boundary of the site would
        therefore be 215 litres per second in the 100-year event. When compared to the attenuated
        100-year flow from the site itself of over 600 litres per second (or over 1800 litres per second
        before attenuation) these flows can be seen to be a modest and manageable part of the
        detailed design process.  Their influence on the discharge point would also be minimised by
        their different time to concentration from the site itself, and it should be remembered that they
        would feature as a constant in the hydraulic models for both the existi9ng and proposed
        situations (effectively negating any affect).
 “14,   Provide Figure 4 from the Stormwater Quantity Section of the Cardno Surface Water
        Management Plan.”
        An updated Figure 4 is provided with this letter. Flow routes are shown conceptually at present,
        and will be finalised at the detailed design stage. The roof of the Warehouse will connect to
        rainwater tanks to serve the nursery. The majority of the car park area will be attenuated by a
        detention basin (also featuring a bioretention device for quality treatment) and a smaller area
        will discharge freely to the drain along the western border of the site.  The capacity of the
        detention basin is such that the combined discharges from the site (attenuated and
        unattenuated) will be lower than existing in all events up to and including the 100-year average
        recurrence interval.

        Figure 4 has been updated since publication of the Surface Water Management Plan to include
        the external flows described in the response to Item 13.

We trust that this letter provides a satisfactory response to the information request. If you have any
queries in relation to the response, please do not hesitate to contact us.
Yours sincerely

Martin Giles
Manager, Water Engineering
for Cardno

Enc:      Figure 4a: Proposed Site and Conceptual Drainage Layout
          Dwg No. 1, No. 2, and No. 3.

J:\3501-54\WP\Letter Response to RFI.doc

Used in these records

About this file

File size
18.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E256.001.pdf · 18.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.