Council archive · source document
0015E256.001
Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Text sections not matched to the original PDF pages. See original document to check page numbers.
18.1
Subject Site - It is not immediately clear if the development proposed covers the whole of the three
allotments described as the subject site, or only part of them. The traffic report deals only with the
impacts of traffic generated by the Bunning’s Warehouse component of the total site. If the only
development which is the subject of the application is the Bunning’s Warehouse, this should be
clarified, although the traffic impact assessment report should, in any event, also demonstrate the
long term feasibility of the traffic access arrangements proposed for the whole development site
shown on the John R. Brogan "Proposed Siting Plan" 1096-011A.
The TTM traffic report only refers to the traffic engineering effects of developing the Bunning’s Warehouse.
However, above-mentioned Plan 1096-011A also refers to the residual site area as being 46,600 sq.m. in
area. :
Based on a gross floor area yield of 35% of total site area the balance site would be capable of
accommodating approximately 16,300 sq.m.(gfa) of development. If this was to be light industry it would
generate weekday traffic at a rate of approximately 5 vpd/100sq.m. or approximately 0.5 vph/100sq.m. in
peak hours. This would be result in the balance site generating no more than 100 vph (say) in weekday peak
hours. This is equivalent to approximately 30% of that traffic which the TTM report describes as likely to be
generated by the Bunning’s Warehouse development on peak weekdays such as a Thursday. The probable
distribution of this additional traffic is shown in the following diagram.
Notwithstanding that the estimated potential traffic movement to and from the balance site is relatively low,
particularly after distribution to road approaches, TTM has included traffic potentially generated by the
balance site in estimates of future intersection operations given in the response to 18.2.
45%
45 vph Thurs
SC / Peak Hours yey —
rer sain ineehy sa = _ Hy (So G8 aa
; ae eon 7 eae
Bs IN IO OE ee
20% oe Gee Taw ae {on ee Se
tive fee og) ere ON oe Y
20 von urs Pe ey | atest
Peak Hours [Oia@eag SECT Ef Counc CG
TS eee HA pos seem $3 DOSS ~D ONG} Gace SANs e BSE, yA
eK Oe, 1) >| 15%
ff) LS Ble can fee) Peak Hours
hae 15% ans 5% : Sea TA
—~| 15 vph Thurs Ke) | Svph Thurs fo ed
oe Peak Hours | Peak Hours aes aes NN
Fig 1 Estimated Balance Site Weekday Peak Hour Development Traffic Distribution
2See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E256.001.pdfRelated documentPublic source context ↗
Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.