18.2
Traffic Volumes without Subject Development - Table 2 in the TTM Report estimates future (2016)
traffic volumes based on forecasts in the CATT2016 report, particularly dealing with the impacts of
road network changes principally including 'the Construction of Walter Hay Drive and Eenie Creek
Road Stage 2. Whatever impact these road network additions are going to have will have occurred
before the TTM traffic counts of November 2006. It is noted that Walter Hay Drive opened in May
2006, Eenie Creek Road Stage 2 opened in April 2006, the duplication of Eenie Creek Road Stage 1
occurred in October 2006, and Eenie Creek Road Stage 3 is currently scheduled to open in August
2008. However, Stage 3 is expected to have only minor impact on Eumundi-Road traffic volumes
Consequently, the applicant should independently estimate 2017 traffic volumes based on their own
growth estimates from the 2006 traffic counts, and use those projections for analyses of 2017
operations.
In response to this question TTM has made estimates of 2017 Thursday afternoon peak hour traffic demands
* at intersections in proximity to the subject site. The estimates are shown in Figs 2, 3 and 4
To make the estimates TTM has assumed a growth in “base” traffic amounting to 35% over the period to
2017 relative to traffic demands surveyed by TTM in 2016 and reported in the TTM report which
accompanied the application. TTM has also included estimated future traffic movements associated with
future development of the balance site based on a traffic generation rate of 0.5 vph / 100 sq.m.(gfa) for
industrial development. Nominally, this gives a potential traffic generation of 100 vehs/hour in peak hours.
The results of analysis of intersections is contained in an attachment.
The analysis indicates that all intersections will be operating at or near capacity in 2017 with extensive
queuing. However, the proposed Bunning’s development and the eventual development of the balance site
will only contribute a small proportion of future traffic increases and intersection congestion in the period
leading up to 2017. This proportion is equivalent to 5% of 2017 Eumundi Road traffic to the east of the
Renee Street and 6% of traffic to the west of Renee Street. These traffic contributions (increases) due to the
proposed development are at the top end of what has been defined by the Queensland Courts as
“significant” (ie 5%). The analysis indicates that the Renee Street roundabout which incorporates the
Bunnings access will operate better in 2017 than the Eumundi Road intersections at Eenie Creek Road and
Beckmans Road.
Based on the future traffic analysis, the developers responsibility in relation to addressing impacts arising
from the development are considered to be satisfied through improvements which the developer will
effectively make at the Renee Street / Eumundi Rd intersection.
3See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E256.001.pdfRelated documentPublic source context ↗
Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.