Parking Provision Rate - The parking provision rate per square metre proposed for the Bunnings
development is significantly higher than has previously been agreed to be appropriate for a use of
this type. This higher provision rate should be explained and/or justified. Further, if parking provision
rates are to be higher than normal, will design traffic generation rates be similarly increased?
It is proposed to supply 285 parking spaces within the Bunnings Warehouse development. This is equivalent
to a rate of 3.67 spaces / 100 sq.m.(gfa). The proposed parking provision is consistent with parking provided
at Bunning’s Warehouse developments in general. The parking provision is not based on the Council
requirement which would require less parking than that proposed at a rate of 2 spaces/100 sq.m.(afa).
The traffic generation rates described in the TTM report and applied into estimating probable development
traffic generation are obtained from surveys of Bunnings Warehouse developments similar to that proposed
and containing parking at rates similar to , and in instances greater than that proposed for the subject site.
Consequently, the traffic generation estimates given in the TTM report have a direct relationship to the
proposed parking supply and bear no relationship to a lower parking rate which might be required under the
Noosa Plan.
Therefore, there is no justification or requirement to increase traffic generation rates used by TTM as they
are directly related to and reflect the proposed rate of parking supply.
18.4
Roundabout at Eumundi Road and Rene Street - At Section 11 of the TTM report, is advised that the
Rene Street roundabout should be upgraded to provide two circulating lanes with a central island
diameter of not less than 23 metres. A design for the upgraded roundabout has been previously
agreed. However, the proposal plans (for example, the John R. Brogan plan 1096-030A) do not show
either dedication for, or construction of, the upgraded roundabout. The upgrading proposed needs to
be clarified / confirmed.
It is proposed that the applicant/developer will construct the Rene Street / Eumundi Road roundabout to
standards described in AustRoads, Part 4. This specifies an inner island radius 12 metres with 10.3m
circulating lanes. These dimensions are consistent with (albeit not exactly the same) the roundabout
dimensions agreed in the previous court appeal which preceded the current application (see Attachment 2).
The applicant/developer will provide for the necessary dedication of land to accommodate the roundabout
upgrading. The exact location of property boundaries etc. to accommodate the roundabout consistent with
Council standards regarding verge widths etc. will be determined in the detailed design of the roundabout
upgrade. ;
On advice from TTM the applicant has prepared a preliminary drawing showing proposed new property
boundaries etc. to accommodate the roundabout and other road reserve requirements noted in Council's
Request.
5See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E256.001.pdfRelated documentPublic source context ↗
Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.