Queue Provisions - The queues at the Rene Street roundabout site access need to be reviewed in
detail to ensure long term satisfactory operation, particularly taking account of the roundabout
upgrading. Also Council believes that access to and from the site at the roundabout should be single
lane in each direction not two lane as indicated on the proposal plans, please amend.
The development of the subject site will have little effect on queuing on roundabout road approaches other
than on the Rene Street approach. In that context the primary potential for queue lengths to develop will
occur on the exit from the development. In the event that this occurs traffic leaving the site would divert to the
Gateway Drive exit from the site, thereby allowing queuing effects to be compensated and maintained at
level which do not obstruct internal parking etc. activities.
Notwithstanding the above, the estimated 95" percentile traffic queue in the development exit will be less
than 2 vehicles in the 2017 Thursday afternoon peak hour (see attached SIDRA output). The estimates
indicate that the Renee Street roundabout will operate at a degree of saturation of approximately 90% in
2017 under the influence of the Bunnings development and potential development of the balance site.
The roundabout shown in the submitted development plan only provides for a single lane entry to the site by
providing a 5m wide lane necessary to accommodate the swept path of large vehicles. However, the plan
does intend that a two lane exit from the site to the roundabout is provided consistent with other approaches
to the roundabout. This is consistent with the roundabout concept previously agreed with Council (see
Attachment 2).
TTM does not agree with Council that the exit from the site to the roundabout should be limited to a single
lane. Amongst other things, to do so would be to ensure that random flow at downstream locations is
mimimised due to the greater effect which a single lane entry would have in filling eastbound gaps through
the roundabout, thereby effectively reducing downstream intersection absorption capacities. Also, there are
benefits to the overall operation of the intersection to maximise the ultility of the roundabout for westbound
movements out of the site, thereby reducing U-turn movements generated from Gateway Drive.
In summary, it is to the advantage of the overall function of the roundabout, the function of Gateway Drive
and the function of other downstream intersections that the development exit is provided with a two lane
approach to the roundabout.
In the course of investigating this matter it was found that it would be desirable to modify the internal
approach to the roundabout to assist roundabout approach conditions inside the site. This suggested change
to the development plan is shown below and is understood to now be incorporated into the plan.
ane Oy Oo ‘ q ~ 2 TS Be <a Se |
g Gxt) a TNC {AFD
[ AN NN
BB ct nd SY a ST ON ont nr
) BI | cle beth Me
im 4 S i ALN, < WW) Vt Hy \ LUN Gree!
is a | SEA) eceibar = mets — aoa S
at IINNIESsI coum | 2 ay Jo. ypeasoao,
Sh— QO, ge Swi yee ME saa Z| \
A ix] f Lg ¢ af ) oa oh ar 6B
A aot ye Tee 1) le | %
- a '=2 Wo SAF 8 & 1 \ AV, 4
Se peewee | Met BL
eS Feta ET .. 3 | ne hy ae \ sige
I g ff os \ i Si a H OP Roger Pole
F Z s £ =~ Cy Ve a wx”
f “ig ff K. R ? r KE “St. BY Water shots) a ee
< e f ers oO AS 6: “ eo i? eh. o on does fonc
7 jf ‘ f Ai . Ss ad ® PS i aL 0.95
7 f/f J LT. « ae SAN age Pe cp | Recommended fe
/ (ff gs ENCE ASAE cana, ee .
fy Af ies Pe ae) ccna
ALA LDA hh IEE Mnf | « . | parking/access
‘ Lfef beF 4 Se LY \ ‘\—+| arrangements.
thy ff oe a i aa eae a oa
q coe er ve -_ * 7 a :
EUMUNDI — aes 5 : gt p
6See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E256.001.pdfRelated documentPublic source context ↗
Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.