Council archive · source document
0015E256.001
Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Text sections not matched to the original PDF pages. See original document to check page numbers.
18.7
Future Connection of the Gateway Drive with Venture Drive — Please assess and address the impact
of development on the future intersection of Venture Drive and Gateway Drive and the future
additional traffic flows in Gateway drive. Also investigate any impact of the additional road traffic on
the design of the proposed accesses from the Gateway Drive frontage of the site.
Whilst it is appreciated that regard needs to be given to known changes in the road and street network which
may potentially affect operation of proposed development access, it is not within the resources of this
developer to investigate in detail wider road and street network traffic demand and associated planning
issues which may arise from new road connections and/or future developments.
Notwithstanding the above, the only impact which the connection of Gateway Drive to Venture Drive may
have on operation of the subject development access is in respect to the capacity to store vehicles turning
right to the development from Gateway Drive and vehicles queuing within the site which seek to leave the
subject development.
The following table shows the estimated capacity for the above movements based on the provision of a
single exit lane from the development and the provision of a marked 30m long right turn lane (with 30m
taper) in Gateway Drive as recommended in response to 18.7. These estimates are based on the maximum
traffic demand (say 100 vph) which could conceivably ever be generated by the development on the
indicated Gateway Drive movements.
Max Nominal a
Facility VPH When Facility at Capacity Critereon Comment :
Demand Opposing Movement VPH Assessment 2
Right Turn-In lane 100 1750 Queue Length of 5 vehs Right turns opposed by southbound traffic in Gateway Drive e
ae a
Right Out , 100 1250 Gaps Right turns out of site will occur when Ventura Dve connected. i
The estimates indicate that it is highly improbable that traffic volumes in Gateway Drive will ever be of such
magnitude to cause a traffic management problem at the proposed access driveways for the development.
That is, the estimates indicate that Gateway Drive traffic movements would need to approach approximately
12,500 vehs/day or 1,250 vehs/ hour before delays within the right turn lane in Gateway Drive or within the
site would be likely to cause problems.
18.8
Bicycle Parking Spaces and Facilities - The proposed number of 5 bicycles parking spaces is
considered grossly inadequate. Bicycles parking spaces should be generally provided in accordance
with AS2890.3 Bicycle Parking Facilities. It is suggested a minimum of 15 spaces be provided on site
and the customers’ spaces be separated from the employees’ spaces. End-of-trips facilities (e.g.
lockers, shower cubicles with ancillary change rooms) should also be provided for the employees’ .
spaces.
TTM has advised the applicant to provide 15 bicycle parking spaces of which 5 spaces (10% of staff) should
be provided for employees in a secure location. Customer spaces should be located in close proximity to the
development entry to facilitate convenient access, bicycle security and bike loading. Change rooms/showers
are to be provided within the development as part of staff amenities.
If you require any further advice/response please call me on 07 3327 9500.
Glen Holdsworth
Senior transport/ Traffic Engineer
Ref : 509965rfi
8See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E256.001.pdfRelated documentPublic source context ↗
Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.