Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

0015E256.001

of 79

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Text sections not matched to the original PDF pages. See original document to check page numbers.

18.6
Access to Gateway Drive — Two public access driveways are proposed to Gateway Drive (in addition
to the primary site access via the Rene Street roundabout). At most, one public access driveway to
Gateway Drive is likely to be justified. The proposed access arrangements should be justified or
amended. Queue provisions and turning lane treatments at these proposed driveways should also be
examined.
The proposed access arrangements in Gateway Drive are typical of all Bunnings Warehouse developments
and represent sound traffic engineering principles which are ;
    e   There should desirably be a clear separation of large vehicle movements from car park traffic and
        associated general customer vehicle movements. In our experience Noosa Shire has supported this
        principle. The two access driveways to/from Gateway Drive are specifically designed to satisfy this
        traffic engineering principle. A single driveway would require truck movements to occur via the car
        parking area.
    e   There should desirably be at least one access point/frontage for every 500 vph generated by the
        development in order to ensure that access activities do not unacceptably impose on passing traffic
        levels of service. This objective is represented in Australian parking standards (eg. AS2890.1) and is
        evident as a desirable objective in many other developments including Bunnings developments. In
        this instance it is estimated by TTM that development traffic generation will approach 500 vph in
        periods of peak traffic generation, thereby indicating the desirability of two access points/frontages.
Notwithstanding the second of the above traffic engineering principles, the requirement to separate large
vehicles from general parking areas and driveways dictates the desirability of separate driveways on the
Gateway Drive frontage.
With respect to lane treatments at the Gateway Drive access driveways, TTM is of the view that it would be
desirable to provide a centrally located painted right turn lane of 3m width, 30m long with 30m taper in
Gateway Drive in advance of both access driveways together with on-street parking being banned across the
site frontage. The kerb-kerb width of Gateway Drive (13m) is adequate to accommodate central right turn
lanes leaving approximately 5m width between the edge of turn lane and kerbs on both sides.

                                                                                                        e

Used in these records

About this file

File size
18.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E256.001.pdf · 18.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.