mt \ p a conics company
stormwater service discharge from the adjoining properties e.g. stormwater pipe discharge
from the rear into the existing gully.
8.5 The location of the existing sewer main on the site
Please refer to the attached Detailed Survey Plan as prepared by PMM (Attachment D).
9. Revised plans of the development to dedicate:-
9.1 A road reserve along Eumundi Noosa Road to achieve a minimum 8m wide footpath
verge between the existing kerb line and boundary line of the site. This is to be adjusted
to accommodate the new kerb line for the modified roundabout.
9.2 Where required, a road reserve along Gateway Drive to achieve a minimum 6m wide
footpath verges between the existing kerb line and boundary line of the site.
9.3 Additional to the road reserve widening an appropriate truncation on the corner of
Gateway Drive and Eumundi Noosa Road is required.
Please refer to attached plans by JR Brogan and Associates detailing the required road reserve dedication
(Attachment A).
10. Plans and cross sections showing the depth of the proposed earthworks (filling and cuts) on the
site including batters and any retaining walls.
Please refer to the attached response as prepared by Cardno. Refer to Attachment B.
11. Cross section/s to show the design levels, batters, accesses and services in relation to Eumundi
Noosa Road and Gateway Drive.
Please refer to the attached response as prepared by Cardno. Refer to Attachment B.
12. _ Detailed cross section/s of any proposed filling and retaining works along the gully near the
northern boundary of the proposed development.
Please refer to the attached response as prepared by Cardno. Refer to Attachment B.
13. Provide a stormwater drainage layout plan/s for the site, and demonstrate that the proposed
development will not cause additional stormwater ponding or have adverse impact on the drainage
conditions on the adjoining properties i.e. how is discharge from the upstream properties dealt with.
Please refer to the attached response as prepared by Cardno. Refer to Attachment B.
14. Provide Figure 4 from the Water Quantity Section of the Cardno Surface water Management Plan.
Please refer to the attached response as prepared by Cardno. Refer to Attachment B.
15. Al (to scale) plan showing the car parking layout including dimensions of the spaces and aisles.
Please refer to attached A1 plans (Attachment A).
16. — Details of the loading bay/receiving area show trucks manoeuvring and specifying the types and
sizes of delivery trucks using the site and demonstrating compliance with Australian Standards.
6631_Info Req Response_010807_ke.docSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E256.001.pdfRelated documentPublic source context ↗
Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.