As stated in the attached response from TTM, the loading bay/receiving area will be sufficient in size to
accommodate a range of ridged vehicles and occasional articulated vehicles. Please refer to the attached
response as prepared by TTM Traffic in Attachment C.
17. __ Provide longitudinal sections for all the proposed accesses, ramps and trucks delivery accesses to
demonstrate compliance with Australian Standards.
The attached TTM response states that all accesses proposed meet the relevant Australian Standards.
Please refer to the attached response as prepared by TTM Traffic in Attachment C. Please also refer to
the revised John R. Brogan plans (Attachment A) which illustrate all longitudinal sections for access
ramps.
18. Traffic Related Issues — Please provide response to the following issues raised in relation to traffic
transportation matters and regarding the traffic impact assessment report submitted by TTM dated
February 2007.
18.1 Subject Site — It is not immediately clear if the development proposed covers the whole of
the three allotments described as the subject site, or only part of them. The traffic report
deals only with the impacts of traffic generated by the Bunnings Warehouse components
of the total site. If the only development which is subject of the application is the Bunnings
Warehouse, this should be clarified, although the traffic impact assessment report should,
in any event, also demonstrate the long term feasibility of the traffic access arrangements
proposed for the whole development site shown on the John R Brogan “Proposed Siting
Plan” 1096-01 1A.
The attached TTM response states that the entire site area has the potential to generate relatively low
amounts of traffic movements and will likely not create any major traffic impacts on the surrounding road
networks. Please refer to the attached response as prepared by TTM Traffic in Attachment C.
18.2 Traffic Volumes without Subject Development - Table 2 in the TTM report estimates future
(2016) traffic volumes based on forecasts in the CATT2016 report, particularly dealing
with the impacts of road network changes principally including the Construction of Walter
Hay Drive and Eenie Creek Road Stage 2. Whatever impact these road network additions
are going to have will have occurred before the TTM traffic counts of November 2006. It is
noted that Walter Hay Drive opened in May 2006, Eenie Creek Road Stage 2 opened in
April 2006, the duplication of Eenie Creek Road Stage 1 occurred in October 2006, and
Eenie Creek Road Stage 3 is currently scheduled to open in August 2008. However,
Stage 3 is expected to have only minor impact on Eumundi Road traffic volumes.
Consequently, the applicant should independently estimate 2017 traffic volumes based on
their own growth estimates from the 2006 traffic counts, and use those projections for
analyses of 2017 operations
The attached TTM response recognises that by 2017, all intersections will be at or near capacity, however
the proposed development and possible future developments resulting from the balance land will only
contribute a small portion of this increase in usage. TTM concludes that the proposed road improvements
for Renee Street / Eumundi Road intersection will adequately satisfy future traffic demand. Please refer to
the attached response as prepared by TTM Traffic in Attachment C.
6631_Info Req Response_010807_ke.docSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E256.001.pdfRelated documentPublic source context ↗
Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.