Council archive · source document
0015E256.001
Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Text sections not matched to the original PDF pages. See original document to check page numbers.
Eenie Creek Rd Intersection
2017 PM Peak Hour
Intersection ID:
Roundabout
Table S.7 - LANE PERFORMANCE
Dem Queue
Flow Cap Deg. Aver. Eff. 95% Back Short
Lane Mov (veh (veh Satn Delay Stop ----------- Lane
No. No. /h) /h) 3s (sec) Rate (vehs) (m) (m)
South: South Approach
L. i 47 306 0.153 16.6 0.93 0.9 7
2 TR 2, 137 446 0.307 13.5 0.95 2.02 16
: 3
East: East Approach )
L oe 4, 534 591 0.904 25.7 1.40 13.5 97
5
2 TR 5, 414 458 0.904 $2..2 1.39 12.2 87
6
North: North Approach
1 LTR ihe 808 764 1.057 150.5 4.16 85.1 606
8
2 8 8 682 645 1.057 156.2 3.90 7339 526
* West: West Approach
1 LT AG, 878 1226 0.716 9.4 0.74 9.9 71
Li
2 TR its 788 1101 0.716 9.0 0.76 9.9 ie
12
‘ )
36See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E256.001.pdfRelated documentPublic source context ↗
Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.