Council archive · source document
0015E256.001
Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Text sections not matched to the original PDF pages. See original document to check page numbers.
Eenie Creek Rd Intersection
2017 PM Peak Hour
Intersection ID:
Roundabout
Table S.10 - MOVEMENT CAPACITY AND PERFORMANCE SUMMARY
Mov Mov Dem Total Lane Deg. Aver. Eff. 95% Perf.
No. Typ Flow Cap. Util Satn Delay Stop Back of Index
(veh (veh Rate Queue
/n) /h) (3) x (sec) (veh)
South: South Approach
LG 47 306 100 0.154 1656 0:93 0.9 1423
2) 135 440 100 0.307 13.4 0.95 22 3.29
3) RK 2 7 100 0.286 19.4 0.98 2328 0.05
\ East: East Approach
: 4.L Tg 21 100 0.905 26.7 1.40 13.5 0.65
5) ¥ 7187 871 100 0.904 27.2 1.40 13.5 27x32
6R 142 157 100 0.904 36.2 1.40 12.2 5.49
North: North Approach
7 203 192 100 1.057 147.0 4.16 85 «fl 23..55.
8 TR E287 1247 100 1.058* 154.1 4.02 85.1 152.41
West: West Approach
10 L 847 1183 100 0.716 9.4 0.74 9.9 17.48
Li ® 817 1141 100 0.716 9.0 0.76 9.9 17.26
12 R 2 3 100 0.667 15.1 0.90 9.9 0.05
* Maximum degree of saturation
, 37See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E256.001.pdfRelated documentPublic source context ↗
Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.