Council archive · source document
0015E256.001
Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Text sections not matched to the original PDF pages. See original document to check page numbers.
26/03 2007 17:27 FAX 61 7 54495354 Noosa Shire Council [gj] 0003/0006
oS 8.2. The detailed topography of the rear of the site showing both sides of the
- existing gully. .
, 8.3. Survey of the frontage of the site in order to ascertain the differential levels
: between the kerb line of Eumundi Noosa Road and the topography of site
. and the existing batter within the property. _
. 8.4. The actual locations of the existing public services within and outside the
ae property including the existing storwater inlets and culvert in Gateway
_ Drive, and any existing stormwater service discharging from the adjoining
properties eg stormwater pipe discharging from the rear into the existing
. . gully. : ,
8.5. The location of the existing sewer main on the site. .
a ' 9, Revised plans of the development to dedicate:- _
ae 9.1. Aroad reserve along Eumundi Noosa Road to achieve a minimum 8m wide os
footpath verge between the existing kerb line and boundary line of the site.
This is to be adjusted to accommodate the new kerb line for the modified
‘ roundabout. , . - . ‘
, 9.2. Where required, a road reserve along Gateway Drive to achieve a minimum - .
oe 6m wide footpath verges between the existing kerb line and boundary line ~
. of the site. , a ; :
oe. ; ;
9.3. Additional to the road reserve widening an appropriate truncation on the .
corner. of Gateway Drive and Eumundi Noosa Road is required.
. _ 10. Plans and cross sections showing the depth of the proposed earthworks (filling |
and cuts) on the site including batters and any retaining walls. . | .
. 11. Cross section/s to show the design levels, batters, accesses and services in-
relation to Eumundi Noosa Road and Gateway Drive. - -
12. Detailed cross section/s of any proposed filling and retaining works along the
; gully near the northern boundary of the proposed development. 7 = @
- 13. Provide stormwater drainage layout plan/s for the site, and demonstrate that the
.' proposed development will not caused additional stormwater ponding or have
adverse impact on the drainage conditions on the adjoining properties i.e. how is
discharge from the upstream properties dealt with.
14. Provide Figure 4 from the Water Quantity Section of the Cardno Surface Water , |
. Management Plan. oo, So
15. At (to scale) plan. showing the carparking layout including dimensions of the ,
"spaces and aisles. : OS oe
. 16. Details of the loading bay/receiving area showing trucks’ maneuvering and
specifying the types and sizes of delivery trucks using the site and demonstrating - S
compliance with Australian Standards. : 2
: Award Winner - Australian Clean Beach — oS
_ Challenge 2004 Litter Prevention ;See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E256.001.pdfRelated documentPublic source context ↗
Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.