26/03 2007 17:28 FAX 61 7 54495354 _ Noosa Shire Council 000470006
17. Provide longitudinal sections for all the proposed accesses, ramps ‘and trucks ,
3 delivery accesses to demonstiate compliance with Australian Standards.
. 18. Traffic Related Issues - Please provide response to the following issues raised in ,
relation to traffic and transportation matters and regarding the traffic impact :
assessment report submitted by TTM dated February 2007.
18.1. Subject Site - it is not immediately clear if the development proposed
covers the whole of the three allotments described as the subject site, or
_ only part of them. The traffic report deals only with the impacts of traffic
- generated by the Bunnings Warehouse component of the total site. If the
‘only development which is the subject of the application is the Bunnings
Warehouse, this should be clarified, although the traffic impact assessment
report should, in any event, also demonstrate the long term feasibility ofthe
traffic access arrangements proposed for the whole development site
shown on the John R. Brogan “Proposed Siting Plan" 1096-0114.
4 . 18.2. Traffic Volumes without Subject Development - Table 2 in the TTM. report
, 3 estimates future (2016) traffic volumes based on forecasts in the ,
t . . CATT2016 report, particularly dealing with the impacts of road network —
, . changes principally including the Construction of Walter Hay Drive and oo
: . ', Eenie Creek Road Stage 2. Whatever impact these road network additions Co
“ are going. to have will have occurred’ before the TTM traffic counts of
, November 2006. It is noted-that Walter Hay Drive opened in May 2006,
Eenie Creek Road Stage 2 opened in April.2006, the duplication of Eenie
Creek Road Stage 1 occurred in October 2006, and Eenie Creek Road
Stage 3 is currently scheduled to open in August 2008. However, Stage 3
. is expected to have only minor impact on Eumundi Road traffic volumes. .
. Consequently, the applicant should independently estimate 2017 traffic
. - volumes based on their own growth estimates from the 2006 traffic counts;
: and use those projections for analyses of 2017 operations. ,
-, 18.3. Parking Provision Rate - The parking provision rate per square metre
: proposed for the Bunnings -development is significantly higher than has -
previously been agreed to be appropriate for a use of this type. This higher :
provision rate should be explained and/or justified. Further, if parking
. : provision rates are to be higher than normal, will design traffic generation
rates be similarly increased? - ; :
a 18.4. Roundabout at Eumundi Road and Rene Street - At Section 11 of the TT™M
ae report, it is advised that the Rene- Street roundabout should be upgraded to a
. : provide two circulating lanes with a central island diameter of not less than
- 23 metres. A design for the upgraded roundabout has been previously
oe: ; agreed. However, the proposal plans (for example, the John R. Brogan
_ @ plan 1096-030A) do not show either dedication for, or-construction of, the a
upgraded roundabout. The upgrading proposed needs to be clarified /
_ confirmed. - _
| Award Winner - Australian Clean Beach eG
_ Challenge 2004 Litter Prevention ; yySee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E256.001.pdfRelated documentPublic source context ↗
Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.