Original source · versioned page text
P0198-25-001_12_Gympie_Street_Tewantin_SWMP
Very large file (16.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
assessment of catchment behaviour. Therefore, DRAINS model results have been adopted for final
design.
• Minor discrepancies, particularly for higher AEP events (20-year and above), indicate that the Rational
Method provides a reasonable approximation for design verification.
• The largest discrepancies are typically observed in low-frequency events (1 to 5 year), where DRAINS
captures additional hydrological complexities such as temporal rainfall variation and surface storage,
which are not represented in the Rational Method.
12 GYMPIE STREET, TEWANTIN
Stormwater Management Plan 11
Client Reference: P0198-25-001 4 November 2025
Prepared for Novato Group
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.