Original source · versioned page text
P0198-25-001_12_Gympie_Street_Tewantin_SWMP
Very large file (16.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
List of Tables and Figures
Table of Contents
Executive Summary ............................................................................................................................. 3
1 Introduction ................................................................................................................................ 4
1.1 Background and Scope .............................................................................................................................. 4
1.2 Stormwater Management Objectives and Design Approach .................................................................. 4
1.3 Supporting Documentation and Reports ................................................................................................... 5
2 Existing Site ................................................................................................................................ 6
2.1 Site Overview .............................................................................................................................................. 6
2.2 Flow calculation using the Rational Method ............................................................................................. 7
2.3 DRAINS model and comparison to Rational Method ................................................................................ 9
3 Proposed Development Works ................................................................................................ 12
3.1 Proposed Site Description........................................................................................................................ 12
3.2 Time of Concentration Inputs into DRAINS ............................................................................................. 13
3.3 Hydrological Modelling Results ................................................................................................................ 14
3.4 Stormwater Detention and Mitigation Strategy ...................................................................................... 15
4 Stormwater Quality .................................................................................................................. 17
4.1 Introduction ................................................................................................................................................17
4.2 Stormwater Quality Modelling (MUSIC) Methodology ............................................................................17
4.3 Stormwater Pollutant Reduction Performance ....................................................................................... 18
4.4 Analysis and Compliance with Water by Design Guidelines .................................................................. 18
4.5 Stormwater Management Implications.................................................................................................... 18
4.6 Erosion and Sediment Control ................................................................................................................. 19
5 Conclusion ................................................................................................................................ 20
12 GYMPIE STREET, TEWANTIN
Stormwater Management Plan
Client Reference: P0198-25-001 4 November 2025
Prepared for Novato Group
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.