Original source · versioned page text
P0198-25-001_12_Gympie_Street_Tewantin_SWMP
Very large file (16.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
List of Tables and Figures List of Tables Table 1-1 Property Details ................................................................................................................................................ 4 Table 2-1: Rational Method key inputs ............................................................................................................................ 8 Table 2-2: Rational Method flow calculations ................................................................................................................. 8 Table 2-3: DRAINS results for existing catchment ....................................................................................................... 10 Table 2-4: Comparison between DRAINS and the Rational Method ........................................................................... 10 Table 3-1: Comparison of Pre-Development vs. Post-Development Peak Flows ...................................................... 14 Table 3-2: Detention Basin parameters......................................................................................................................... 15 Table 3-3: Mitigated Flow comparison to existing ....................................................................................................... 16 Table 4-1: Pollutant Load Reduction .............................................................................................................................. 18 Table 5-1 Pollutant Load Reduction ............................................................................................................................... 21 List of Figures Figure 2-1: Subject Site Location ..................................................................................................................................... 6 Figure 2-2 Max overland flow path .................................................................................................................................. 7 Figure 2-3: Friend’s equation (QUDM, 2025) .................................................................................................................. 8 Figure 2-4: DRAINS model for existing catchment ......................................................................................................... 9 Figure 2-5: DRAINS catchment inputs ............................................................................................................................. 9 Figure 3-1 Developed Masterplan .................................................................................................................................. 12 Figure 4-1 MUSIC Model ................................................................................................................................................. 17 Appendices Appendix A – DRAINS Results Appendix B – Rational Method Results 12 GYMPIE STREET, TEWANTIN Stormwater Management Plan Client Reference: P0198-25-001 4 November 2025 Prepared for Novato Group
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.