Project No. 306-2474
November, 2006                                                                         Page 5
6.0   ENGINEERING ASSESSMENT
24 ENGINEERING ASSESSMENT
   &.1   Traffickability and Site Preparation
      At the time of the investigation,    problems with traffickability problems were not
      encountered in vehicle accessible areas, due to the surface being well grassed.
      Problems with traffickability could arise from disturbance of the upper soil layers as a
     result of removal of vegetation and existing structures.
     It is recommended that after Stripping, clearing and grubbing, the exposed surface in the
     construction area be proof rolled to delineate weak areas and improve traffickability,
     The use of a sub-base gravel overlay (MRS 11.05, Subtype 2.4, BorC Grading/150mm          @
     nominal layer thickness) should also be considered in vehicle access areas to improve
     general traffickability during construction. Use of tracked equipment may be necessary
    for traffickability on the sand subgrade.
    The relevant contractors should therefore fully inform themselves of the ground
    conditions on site prior to commencement of earthworks.
 6.2   Earthworks
    All earthwork procedures should be carried out in a responsible manner in accordance
    with  AS.3798-1996    “Guidelines  on   Earthworks   for Commercial    and  Residential
    Developments’.
    Earthwork procedures should include the following:-                                        @
     *  Clearing, stripping and grubbing should be carried out in areas subject to earthworks
        and construction.  Also all soils containing organic matter should be stripped from
        the construction area. This material is not considered suitable for use as structural
       fill.
    *  Depressions formed by the removal of vegetation, underground elements etc. should
       have all disturbed weakened soil cleaned out and be backfilled with compacted
       select material.
    *  The in-situ soils, where free of Organic and deleterious material, may be used for
       Structural fill provided the moisture content of the soils on placement approximates
       the optimum    moisture content   required for compaction.      This  may require
       conditioning to bring the soils to optimum.
                                                      YF SOIL SURVEYS ENGINEERING

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015584F.001.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.