Project No. 306-2474
November, 2006 Page 5
6.0 ENGINEERING ASSESSMENT
24 ENGINEERING ASSESSMENT
&.1 Traffickability and Site Preparation
At the time of the investigation, problems with traffickability problems were not
encountered in vehicle accessible areas, due to the surface being well grassed.
Problems with traffickability could arise from disturbance of the upper soil layers as a
result of removal of vegetation and existing structures.
It is recommended that after Stripping, clearing and grubbing, the exposed surface in the
construction area be proof rolled to delineate weak areas and improve traffickability,
The use of a sub-base gravel overlay (MRS 11.05, Subtype 2.4, BorC Grading/150mm @
nominal layer thickness) should also be considered in vehicle access areas to improve
general traffickability during construction. Use of tracked equipment may be necessary
for traffickability on the sand subgrade.
The relevant contractors should therefore fully inform themselves of the ground
conditions on site prior to commencement of earthworks.
6.2 Earthworks
All earthwork procedures should be carried out in a responsible manner in accordance
with AS.3798-1996 “Guidelines on Earthworks for Commercial and Residential
Developments’.
Earthwork procedures should include the following:- @
* Clearing, stripping and grubbing should be carried out in areas subject to earthworks
and construction. Also all soils containing organic matter should be stripped from
the construction area. This material is not considered suitable for use as structural
fill.
* Depressions formed by the removal of vegetation, underground elements etc. should
have all disturbed weakened soil cleaned out and be backfilled with compacted
select material.
* The in-situ soils, where free of Organic and deleterious material, may be used for
Structural fill provided the moisture content of the soils on placement approximates
the optimum moisture content required for compaction. This may require
conditioning to bring the soils to optimum.
YF SOIL SURVEYS ENGINEERINGSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015584F.001.pdfRelated documentPublic source context ↗
07/0528 - Op Works, Landscaping,Access Car Parking & Earthworks - Goode Family Trust [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.