-5-
be pleased to review the report and the sufficiency of | in this regard and/or to make additional report copies
the investigation work, available for contract purposes at a nominal charge.
Every care is taken with the report as it relates to | REVIEW OF DESIGN
interpretation of subsurface conditions, discussion of | Where major civil or structural developments are
geotechnical aspects and recommendations or proposed or where only a limited investigation has
suggestions for design and construction. Since the been completed or where the geotechnical conditions/
test sites in any exploration represent a very small | constraints are quite complex, it is prudent to have a
Proportion of the total site and since the exploration | joint design review which involves a_ senior
only identifies actual ground conditions at the test sites, | geotechnical engineer. We would be happy to assist in
even under the best circumstances actual conditions | this regard as an extension of our investigation
may vary from those inferred to exist. No responsibility | commission.
is taken for:- SITE INSPECTION
+ Unexpected variations in ground and/or groundwater The Company will always be pleased to provide
conditions. engineering inspection services for geotechnical
*Changes in policy or interpretation of policy by | aspects of work to which this report is related.
@ Statutory authorities. i} Site visits during construction to confirm reported
* The actions of other persons. ground conditions
*Any work where the company is not given the | ii) Site visits to assist the contractor or other site
opportunity to supervise the construction using the } personnel in identifying various soil/rock types such as
Companies designs/recommendations. appropriate footing or pier founding depths, the stability
If differences occur, the Company will be pleased to | of a filled or excavated slope: or
assist with investigation or advice to resolve any | iii) Full-time engineering presence on site.
problems occurring. In the vast majority of cases it is advantageous to the
SITE ANOMALIES principal for the geotechnical engineer who wrote the
In the event that conditions encountered on site during | investigation report to be involved in the construction
construction appear to vary from those expected from | Stage of the project.
the information contained in the report, the Company
requests that it immediately be notified. Most
problems are more readily resolved when conditions
@ are exposed than at some later stage, well after the
event.
REPRODUCTION OF INFORMATION FOR
CONTRACTUAL PURPOSES
Attention is drawn to the document "Guidelines for the
Provision of Geotechnical information in Tender
Documents”, published by the Institution of Engineers,
Australia. | Where information obtained from this
investigation is provided for tendering purposes, it is
recommended that ail information, including the written
report and discussion, be made available. In
circumstances, where the discussion or comments
section is not relevant to the contractual situation, it
may be appropriate to prepare a specially edited
document. The Company would be pleased to assist
NOTEREP.SAM SOIL SURVEYS ENGINEERINGSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015584F.001.pdfRelated documentPublic source context ↗
07/0528 - Op Works, Landscaping,Access Car Parking & Earthworks - Goode Family Trust [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.