-5-
                be pleased to review the report and the sufficiency of | in this regard and/or to make additional report copies
               the investigation work,                                   available for contract purposes at a nominal charge.
               Every care is taken with the report as it relates to | REVIEW OF DESIGN
               interpretation of subsurface conditions, discussion of | Where major civil or structural developments are
               geotechnical   aspects    and   recommendations      or   proposed   or where only a limited investigation has
               suggestions for design and construction.     Since the    been completed or where the geotechnical conditions/
               test sites in any exploration represent a very small | constraints are quite complex, it is prudent to have a
               Proportion of the total site and since the exploration | joint   design   review   which    involves   a_  senior
               only identifies actual ground conditions at the test sites, | geotechnical engineer. We would be happy to assist in
               even under the best circumstances actual conditions | this regard as an         extension  of our investigation
               may vary from those inferred to exist. No responsibility | commission.
               is taken for:-                                           SITE INSPECTION
               + Unexpected variations in ground and/or groundwater     The Company will always be pleased to provide
               conditions.                                              engineering   inspection   services  for   geotechnical
               *Changes in policy or interpretation of policy      by | aspects of work to which this report is related.
 @             Statutory authorities.                                   i}   Site visits during construction to confirm reported
               * The actions of other persons.                          ground conditions
               *Any work     where the company is not given the | ii)        Site visits to assist the contractor or other site
              opportunity to supervise the construction using the } personnel in identifying various soil/rock types such as
              Companies designs/recommendations.                        appropriate footing or pier founding depths, the stability
              If differences occur, the Company will be pleased to | of a filled or excavated slope: or
              assist with investigation or advice to resolve any | iii) Full-time engineering presence on site.
              problems occurring.                                       In the vast majority of cases it is advantageous to the
              SITE ANOMALIES                                            principal for the geotechnical engineer who wrote the
              In the event that conditions encountered on site during | investigation report to be involved in the construction
              construction appear to vary from those expected from | Stage of the project.
              the information contained in the report, the Company
              requests  that  it immediately   be   notified.   Most
              problems are more readily resolved when conditions
@             are exposed than at some later stage, well after the
              event.
              REPRODUCTION OF INFORMATION FOR
              CONTRACTUAL PURPOSES
             Attention is drawn to the document "Guidelines for the
             Provision  of  Geotechnical    information  in  Tender
             Documents”, published by the Institution of Engineers,
             Australia. | Where    information obtained from    this
             investigation is provided for tendering purposes, it is
             recommended that ail information, including the written
             report  and   discussion,  be  made    available.    In
             circumstances, where the discussion or comments
             section is not relevant to the contractual situation, it
             may be appropriate to prepare a specially edited
             document. The Company would be pleased to assist

             NOTEREP.SAM                                                                 SOIL SURVEYS ENGINEERING

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015584F.001.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.