. 4.
The DCP comprises a Cone of 20 mm diameter with | >The use of water or mud as a drilling fluid wit! mask
30 degree taper attached to steel rods of smaller | any groundwater inflow. Water has to be bailed out of
section. the bore and mud must be washed out of the hole or
The cone end is driven with a 9 kg hammer falling 510 | "reverted" if water observations are to be made.
mm (AS. 1289 Test 6.3.2). The test was developed | More reliable measurements can be made by use of
initially for pavement subgrade investigations, and standpipes which are read after stabilizing at periods
empirical correlations of the test results with California | ranging from several days to perhaps weeks for low
Bearing Ratio have been published by various Road permeability soils. Piezometers, sealed in a Particular
Authorities. The Company has developed their own Stratum, may be advisable in low permeability soils or
correlations with Standard Penetration tests and | where there may be interference from perched water
Density Index tests in sands. tables or surface water.
LOGS FILL
The borehole or test pit logs presented herein are an The presence of fill materiats can often be determined
engineering and/or geological interpretation of the only by the inclusion of foreign objects (eg. bricks,
subsurface conditions, and their reliability will depend | steel, etc.) or by distinctly unusual colour, texture or @
to some extent on the frequency of sampling and the | fabric. Identification of the extent of fill materials will
method of drilling or excavation. Ideally, continuous | also depend on investigation methods and frequency.
undisturbed sampling or core drilling will enable the | Where natural soils similar to those at the site are used
most reliable assessment but is not always practicable | for fill, it may be difficult with limited testing and
or possible to justify on economic grounds. In any sampling to reliably determine the extent of the fill.
case, the boreholes or test pits represent only a very | The presence of fill materials is usually regarded with
small sample of the total subsurface conditions. caution as the possible variation in density, strength
The attached explanatory notes define the terms and | and material type is much greater than with natural soil
symbols used in preparation of the logs. deposits. Consequently, there is an increased risk of
Interpretation of the information shown on the logs, | adverse engineering characteristics or behaviour. If
and its application to design and construction, should | the volume and quality of fill is important to a project,
therefore take into account the Spacing of boreholes or | then frequent test pit excavations are preferable to
test pits, the method of drilling or excavation, the | boreholes.
frequency of sampling and testing and the Possibility of | LABORATORY TESTING
other than “straight line" variations between the Laboratory testing is normally carried out in ©
boreholes or test pits. Subsurface conditions between accordance with Australian Standard 1289 "Methods of
boreholes or test pits may vary significantly from Testing Soil for Engineering Purposes". Details of the
conditions encountered at the borehole or test pit | test procedure used are given on the individual report
locations. forms and the attached explanatory notes summarize
GROUNDWATER important aspects of the Laboratory Test Procedures
Where groundwater levels are measured in boreholes, | adopted.
there are several potential problems. ENGINEERING REPORTS
«Although groundwater may be present in lower Engineering reports are Prepared by qualified
permeability soils, it may enter the hole slowly or | personnel and are based on the information obtained
perhaps not at all during the time the hole is open. and on current engineering standards of interpretation
*A localized perched water table may lead to an | and analysis. Where the report has been Prepared for
erroneous indication of the true water table. @ specific design proposal the information and
*Water table levels will vary from time to time with | interpretation may not be relevant if the design
seasons or recent weather changes and may not be | Proposal is changed. If this happens, the Company will
the same at the time of construction,
NOTEREP.SAM SOIL SURVEYS ENGINEERINGSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015584F.001.pdfRelated documentPublic source context ↗
07/0528 - Op Works, Landscaping,Access Car Parking & Earthworks - Goode Family Trust [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.