Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2018-05-29 Special Meeting Agenda

of 33

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 24 of 33

Planning                     The infrastructure demand projections are                                                                The demand for all          No action required.       Complies
 assumptions -               based on the projections of population and                                                               networks have been
 demand                      employment growth.                                                                                       developed from the
                                                                                                                                      planning assumptions.

                             The demand generation rates align with                                                                   The demand generation       No action required,       Complies
                             accepted rates and/or historical data.                                                                   rates are consistent with
                                                                                                                                      the guideline, except for
                                                                                                                                      Parks and Land for
                                                                                                                                      Community Facilities which
                                                                                                                                      is in population which is
                                                                                                                                      considered appropriate
                                                                                                                                      when compared with
                                                                                                                                      industry standards. The
                                                                                                                                      ha/ 1000 standard is stated
                                                                                                                                      in Table 15.9 of the LGIP
                                                                                                                                      and is therefore available.
                      22. | The service catchments used for                                                                           ‘The service catchments are | No action required.     Complies
                             infrastructure demand projections are                                                                    shown on cach networks’
                             identified on relevant PFTI maps and                                                                     maps, and these
                             demand tables.                                                                                           catchments are consistent
                                                                                                                                      with the demand tables.

                      23. | The service catchments for each network                                                                   The service catchments      No action required.       Gmplies
                             cover, at a minimum, the PIA                                                                             cover the PIA

                             The Asset Management Plan and Long Term                                                                  Council has undertaken to | No action required.      Complies — process underway
                             Financial Forecast align with the LGIP                                                                   develop longer term plans
                             projections of growth and demand.                                                                        including LIFF and AMPs.
                             Ifnot, is there a process underway to
                             achieve this?

Priority              25. | The drafting of the PlAsection is consistent                                                              ‘The section is consistent  No action required.      Complies
infrastructure               with the LGIP template.                                                                                  with the LGIP guideline
 area (PIA)                                                                                                                           template.

                                                                                                                                                                                                   Page 24 of 33
Log in to download the original file

2018-05-29 Special Meeting Agenda(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.