Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2018-05-29 Special Meeting Agenda

of 33

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 25 of 33

27. | The PlAboundary shown on the PlAmap is        Y                                 i             Yes            The PlAboundary is legible | No action required.      Complies
                             legible at a lot level and the planning                                                                      at the lot level, on a base of
                             scheme zoning is also shown on the map.                                                                      the planning scheme zones.
                             The PlAincludes all areas of existing urban                  |          j                                    The PlAboundary is Iegible | No action required.      Complies
                             development serviced by all relevant trunk                    \          [A& all                             at the lot level, on a base of
                             infrastructure networks at the time the LGIP                  i                york      :                   the planning scheme zones.
                             was prepared.                                                        nts  Co!     i
                             The PlAaccommodates growth for at least                         ie pl     as                  Yes            The planning assumptions | No action required,        Complies
                              10 years but no more than 15 years.                                        h                                show there is capacity in
                                                                                              )                  \                        the PIAto 2031 allowing for
                                                                                           2    :                                         10-15   years’ growth.
                             Are there areas outside the PIA for which       de               inor           ‘grov                        There is no significant     No action required.       Complies
                             the planning assumptions identify urban                                      ype sei                         urban growth identified
                             growth within the next 10 tolS years?                             stri      :                                outside the PIA.
                             If so, why have these areas been excluded                              }    is. H   ‘
                             from the PIA?                                                        i     1       all  tot:

                       31. | The PlAachieves an efficient, sequential                                                                     Provision of infrastucture  No action required.       Complies
                             pattern of development.                                                           hat is to                  within the PlA achieves an
                                                                                             p                                            efficient pattern of
                                                                                                i                                         development.
Desired                      ‘The drafting of the DSS section is consistent                      SS has |       i                         ‘The section is consistent  No action required.       Complies
 standards of                with the LGIP template.                                                 1     e te                           with the LGIP guideline
 service (DSS)                                                                                                             |              template.
                       33, | The DSSsection states the key planning and      :               ie  DSS:       ntain          Yes            The DSS section outlines    No action required,       Complies
                             design standards for each network.                                    :     {      le                        the key planning and
                                                                                             ch net                                       design standards.

                             The DSS reflects the key, high level industry                       Sare         nt W                        The DSS are consistent with | No action required.     Complies
                             standards,    regulatory   and __ statutory                                                                  industry standards.
                             guidelines and codes, and planning scheme                       rastr         p
                             policies about infrastructure.                                               on:    it wi

                             There is alignment between the relevant |      Yes (Part!                          ;                         Council has undertaken to | No action required.       Complies — process underway
                             levels  of service   stated  in  the  local                                    from:                         long term LIFF and AMPs.
                             government's Long Term Asset Management                               C      %e  gio
                             Plan (LTAMP) and the LGIP.
                             Ifnot, is there a process underway to                         As such
                             achieve this?                                                      ;             19

 Plans for trunk             The drafting ofthe PFTI section is consistent | Yes               s          !                               The section is consistent   No action required,       Complies
infrastructure               with the LGIP template.                                          ;                                           with the LGIP guideline
 (PFT) —                                                                 |                                                                template.

                                                                                                                                                                                                          Page 25 of 33
Log in to download the original file

2018-05-29 Special Meeting Agenda(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.