27. | The PlAboundary shown on the PlAmap is Y i Yes The PlAboundary is legible | No action required. Complies
legible at a lot level and the planning at the lot level, on a base of
scheme zoning is also shown on the map. the planning scheme zones.
The PlAincludes all areas of existing urban | j The PlAboundary is Iegible | No action required. Complies
development serviced by all relevant trunk \ [A& all at the lot level, on a base of
infrastructure networks at the time the LGIP i york : the planning scheme zones.
was prepared. nts Co! i
The PlAaccommodates growth for at least ie pl as Yes The planning assumptions | No action required, Complies
10 years but no more than 15 years. h show there is capacity in
) \ the PIAto 2031 allowing for
2 : 10-15 years’ growth.
Are there areas outside the PIA for which de inor ‘grov There is no significant No action required. Complies
the planning assumptions identify urban ype sei urban growth identified
growth within the next 10 tolS years? stri : outside the PIA.
If so, why have these areas been excluded } is. H ‘
from the PIA? i 1 all tot:
31. | The PlAachieves an efficient, sequential Provision of infrastucture No action required. Complies
pattern of development. hat is to within the PlA achieves an
p efficient pattern of
i development.
Desired ‘The drafting of the DSS section is consistent SS has | i ‘The section is consistent No action required. Complies
standards of with the LGIP template. 1 e te with the LGIP guideline
service (DSS) | template.
33, | The DSSsection states the key planning and : ie DSS: ntain Yes The DSS section outlines No action required, Complies
design standards for each network. : { le the key planning and
ch net design standards.
The DSS reflects the key, high level industry Sare nt W The DSS are consistent with | No action required. Complies
standards, regulatory and __ statutory industry standards.
guidelines and codes, and planning scheme rastr p
policies about infrastructure. on: it wi
There is alignment between the relevant | Yes (Part! ; Council has undertaken to | No action required. Complies — process underway
levels of service stated in the local from: long term LIFF and AMPs.
government's Long Term Asset Management C %e gio
Plan (LTAMP) and the LGIP.
Ifnot, is there a process underway to As such
achieve this? ; 19
Plans for trunk The drafting ofthe PFTI section is consistent | Yes s ! The section is consistent No action required, Complies
infrastructure with the LGIP template. ; with the LGIP guideline
(PFT) — | template.
Page 25 of 33See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.