Decison package_Noosa Chocolate Factory
Attached to the e-mail MCU16/0098 & OPW16/0183 - Request to change existing approval - 21 Venture Drive NOOSAVILLE.
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
Noosa Council documents
MCU16/0098
Sheet 09 of 09 Q Landscape Details, prepared by Building Suncoast 11.09.16
Green
LANDSCAPING WORKS
29. The low wall and screening trellis near the corner of Venture Drive and the
unnamed Road must be setback in accordance with the approved Landscape
Plans.
30. All landscape works must be constructed and undertaken generally in accordance
with the approved plans and conditions detailed in this Decision Notice.
31. Turfed areas within the Venture Drive and the unnamed road reserves must:
a. Join smoothly and level with adjoining surfaces.
b. Be free of disease, pest, weeds, rock and debris.
32. Landscape works must:
a. Take all measures to prevent Fire Ants (or any stages of the fire ant life
cycle) entering the work site.
b. Take all measures to prevent Myrtle Rust infection.
c. Not obstruct overland flow paths and must include adequate drainage to
minimise ponding. Mulch or any floatable material must not be located in
swales, overland flow paths or around grated drains.
d. Not encroach onto kerb and channel, footpaths, pedestrian or vehicular/
circulation areas.
e. Not restrict access to service meters.
f. Delineate all garden to grassed area interfaces with a hard edge.
g. Ensure sales signage and ancillary infrastructure is not installed within the
road reserve.
h. Ensure permanent irrigation is not installed within the road reserve.
i. Ensure all weeds and debris are removed from planting areas prior to
planting.
j. Ensure mulch is aged, comprised of leaf and limb material of varying sizes,
free of foreign matter including anthropogenic waste, rock, soil / sediment
contamination and is applied to ensure a minimum 100mm depth once
settled.
33. Soil provided for landscaping must provide for the site specific vegetation
performance objectives.
34. All landscape works must be completed prior to the commencement of use.
ENGINEERING
Prior to Commencement of Works
35. At least 5 working days prior to any works commencing, written advice must be
provided to Council detailing:
a. The name, contact details and ACN for the supervising Registered
Professional Engineer of Queensland (RPEQ) and Principal Contractor.
Page 6 of 18
Document Set ID: 20204040
Version: 1, Version Date: 22/11/2016 Print Date: 22 November 2016, 1:58 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.