Decison package_Noosa Chocolate Factory

Attached to the e-mail MCU16/0098 & OPW16/0183 - Request to change existing approval - 21 Venture Drive NOOSAVILLE.

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 7, section 1. The text section number identifies this passage in the reader.

Noosa Council documents




                                                                                                        MCU16/0098


                              b.       Proposed dates for commencement and completion of construction.
                      36.     The principal contractor must have all the appropriate insurance and public liability
                              documentation to carry out the works. The principal contractor is also responsible
                              to ensure that any subcontractors also have the appropriate insurance and public
                              liability documentation. Certificates demonstrating currency of public liability
                              insurance and works insurance covering the works must be submitted to Council
                              prior to the prestart meeting.
                      37.     Council must be contacted at least 5 working days prior to any works commencing
                              to organise a prestart meeting*. The contact number to arrange a prestart meeting
                              is 5329 6244. The prestart meeting must include the relevant parties for the
                              following aspects of the works:
                              a.       Civil engineering works.
                              b.       Landscape works.
                              c.       Erosion and sediment control works.
                              * (Refer to Advisory Note)
                      38.     Copies of the approved plans, duly signed by the consultant Registered
                              Professional Engineer of Queensland (RPEQ) must be provided to Council’s
                              Engineering Officer Construction at the “prestart” meeting.
                      39.     A detailed condition report including photographs of all frontages of the site must
                              be completed and submitted to Council prior to the prestart meeting.
                      40.     A condition report including photographs of all fences and retaining walls bordering
                              the site and any buildings, structures, pathways, landscaping features etc on
                              adjoining properties that could potentially be impacted on by the proposed
                              earthworks and construction works must be completed and submitted to Council
                              prior to the prestart meeting.
                      41.     A Construction Management Plan must be submitted to Council for approval prior
                              to the prestart meeting and must specifically include/address the following:
                              a.       Traffic Management during all aspects of the construct phase including:
                                       i.     A Traffic Management Control Plan in accordance with Manual of
                                              Uniform Traffic Control Devices (MUTCD) detailing all temporary
                                              signage and traffic control measures to be installed prior to
                                              construction.
                                       ii.    Fencing to the work site during the construction phase to ensure the
                                              safety of the public and the road users.
                                       iii.   Maintenance of safe pedestrians and cyclists access across the
                                              frontage of the site both during daily construction and after daily
                                              construction has ceased.
                                       iv.    Sufficient parking arrangements for trucks, machineries and
                                              construction workers without adversely impacting on traffic flow and/or
                                              the availability of on-street parking in the local street.
                              b.       Maintenance and protection of water quality and existing drainage lines
                                       through the construction site through the implementation of appropriate
                                       erosion and sediment control measures.




                                                                                                              Page 7 of 18


Document Set ID: 20204040
Version: 1, Version Date: 22/11/2016                                                                Print Date: 22 November 2016, 1:58 PM
Log in to download the original file

Decison package_Noosa Chocolate Factory.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.