ORDINARY MEETING MINUTES                                                   19 JANUARY 2017


              Pedestrian and Bicycle Facilities
        22.   Pedestrian and bicycle facilities must be provided for the development. The
              works must be undertaken in accordance with an Operational Works approval
              and must include in particular:
              a.   signage and lighting at strategic locations to direct people to building
                   entries.
              b.   any required pedestrian refuge areas within the carpark to ensure safe and
                   convenient pedestrians movements within the site.
              c.   a total of 9 bicycle parking spaces and 5 end of trip lockers.
              Electricity and Telecommunication Services
        23.   Unless otherwise stipulated by telecommunications legislation at the time of
              construction, the development must be provided with all necessary conduits, pits
              and pipes to accommodate the future connection of optic fibre technology
              telecommunications.
        24.   Any requirement by a service provider to alter, upgrade or encase an existing
              service within the work site must be carried out at the applicant’s expense.
        25.   Certification must be submitted to Council from all relevant service providers
              which certifies that the development has met the requirements of this Decision
              Notice and all applicable legislation at the time of construction.
              Damage to Services and Assets
        26.   Any damage caused to existing services and assets above or below the ground
              must be repaired:
              a.   where the damage would cause a hazard to pedestrian or vehicle safety,
                   immediately; or
              b.   where otherwise, upon completion of the works associated with the
                   development.
                   Any repair work which proposes to alter the alignment or level of existing
                   services and assets must first be referred to the relevant service authority
                   for approval.
              Stormwater Drainage
        27.   The site must be provided with a stormwater drainage system connecting to a
              lawful point of discharge. The works must be undertaken in accordance with an
              Operational Works approval and the Queensland Urban Drainage Manual, and
              must include in particular:
              a.   No adverse impact on other properties and the road’s footpath and grassed
                   verge (e.g. by diverting flows and/or blocking flows and causing additional
                   ponding)
              b.   The use of gravity stormwater drainage only and not surcharge pits or
                   pumps.
              c.   collection and discharge of stormwater to Taylor Court.
              d.   A stormwater detention system to manage peak flows for all storms up to
                   and including 1 in 100 years storm event




                                                                                    Page 7 of 24
Log in to download the original file

2017-01-19 Ordinary Meeting Minutes(PDF, 579KB).pdf · 593 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.