Skip to the record
For the highest quality transcripts.

Council archive · source document

08/0310 - MCU - Wellbeing Type 2 - Social [As Published] · 132008.310

of 89

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

SEQ REGIONAL PLAN

 

3.11 _|Is any part of the premises within the South East Queensland (SEQ) Regional Plan area?

1 No
C1 Yes

If yes, is the application seeking approval for subdivision*?
(J No
(2 Yes - Answer both (a) and (b) below

(a) Is any part of the premises located within a Major Development Area and not included in a structure plan as defined
under the SEQ Regional Plan Regulatory Provisions? ”

OO No
OO Yes
ityes, indicate whether or not of the folowing Groumstances apply to the subdivision proposal — (Tick if applicable)
‘The subdivision:
Q Creates lots with a size greater than 100 hectares CINo (Yes
(i) Creates a residual lot . , ~~ EJNo Des

(ii) Creates the same number or fewer lots than the number of lots being subdivided “No ‘Les

(iv) Creates a single additional lot when an existing lot is severed by: a road that was -JNo [] Yes

_ gazetted before 2 March 2006
(v) ‘Creates as a single ‘additional lot for an emergency services 2 facity oO No ‘ClYes

‘ (vi) Creates a single additional lot fora water oyale management infrastructure oO No : go Yes
(vil) Creates a single additional lot for waste management facility ‘CONo Cl yYes
(viii) Creates a single additional lot for telecommunications infrastructure (No ‘[] Yes
{ix) Creates a single additional fat for electricity infrastructure CINo (J Yes

.() Creates a single additional | lot for cemetery or a crematorium (No (1) Yes

(xi) Is carried out in n association with a development approval for a material change of [_]No {_] Yes
use of premises that has not lapsed, if the development approval was for a
development application that was made before 31 October 2006

(xii) Is carried out in association with a development approval for a material change of [No ‘Ces
: use of premises that -
« — was given for development made assessable under SEQ Regional Plan
Regulatory Provisions, section 2.4, 2.6, 2.8, 2.10, 2.12, or 2.14; and

e has notlapsed

(xii Creates lots for a purpose or is being carried out in association with development []No [] Yes
other than those stated in (i) - (xii) above

To the extent the application involves other development under (xiii) above - this application must be referred to the
Office of Urban Management (OUM) as
Concurrence Agency.

 

 

 

3 For the purposes of the SEQ Regional Plan, subdivision means — (2) creating a lot by subdividing another lot, or (b) dividing land into parts by agreement (other than a
lease for a term, including renewal options, not exceeding 10 years} rendering different parts of a lot immediately available for separate disposition or separate
occupation)

-B-

 

Used in these records

About this file

File size
4.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0310 - MCU - Wellbeing Type 2 - Social [As Published].pdf · 4.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.