Council archive · source document
08/0310 - MCU - Wellbeing Type 2 - Social [As Published] · 132008.310
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
(b) Is any part of the premises within the Regional Landscape and Rural Production Area or in the Investigation Area?
1 No
(2s Yes - Answer {i) - (ii)
(i) 1s any part of the premises located in a rural precinct or an interim rural precinct and is any lot resulting
from the subdivision proposed to have a lot size smaller than the minimum stated in the refevant planning
scheme for the precinct?
C1 Yes - Complete Table 1
OO No
TABLE 1 - indicate whether or not the following circumstances apply to the subdivision proposal — (Tick if applicable)
The subdivision: ;
() Creates a residual lot ‘ CiNe |Z Yes
(i) Creates the same number or fewer lots than the number of lots being subdivided (No |D Yes
(ii) Creates a single additional lot when an existing lot is severed by a road that was gazetted before |[_]No |(J Yes
2 March 2006
(iv) Creates a single additional lot for an emergency services facility [CINo | Yes
(v) Creates a single additional lot for a water cycle management infrastructure CNo IL) Yes
(vi) Creates a single additional lot for waste management facility LINo |E) Yes
{vil) Creates a single additional lot for telecommunications infrastructure [No |) Yes
(viii) Creates a single additional lot for electricity infrastructure (No {CJ Yes
(ix)_ Creates a single additional lot for cemetery or a crematorium [No | Yes
(x) Is being carried out in association with a development approval for a material change of use of /[_]No |L Yes
premises that has not lapsed, if the development approval was for a development application
that was made before 31 October 2006
(xi) Is being carried out in association with a development approval for amaterial change of use of |[_]No |L] Yes
premises that -
¢ was given for development made assessable under SEQ Regional Plan Regulatory
Provisions, section 2.4, 2.6, 2.8, 2.10, 2.12, or 2.14; and
« has not lapsed
(xii) Is in a rural village as defined under the SEQ Regional Pian Regulatory Provisions (No |(C1 Yes
(xii) {s for a rural residential purpose for land located in the Mt Lindesay/North Beaudesert Study Area jL]No |L] Yes
and -
« _ the development application or development application (superseded planning scheme) for
the subdivision is properly made before 2 March 2008; and
+ _ the subdivision relates to land located in a zone or equivalent designated area mentioned in
a notice published in the gazette by the regional planning Minister
(xiv) Is being carried out under - LINo {LJ Yes
* an exemption given by the regional planning Minister for an application for exemption
lodged before 30 September 2005; and
+ adevelopment approval for a development application that is properly made within six
months of the exemption being given by the regiona! planning Minister
(xv) Involves the extension of an existing lease or licence over land if - CINo {C1 Yes
+ no additional lots are created; and
* any use permitted by a subsequent lease or licence is consistent with a use permitted by
the previous lease or licence; and
« _ the previous lease was obtained before 31 October 2006
(xvi) Creates lots for a purpose or is being carried out in association with development other than |[_]No |L] Yes
those stated in (i) - (xv) above
To the extent that the application involves other development under (xvi) above - the subdivision is prohibited and an application
involving that component cannot be made..
-24-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0310 - MCU - Wellbeing Type 2 - Social [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.