Council archive · source document
08/0310 - MCU - Wellbeing Type 2 - Social [As Published] · 132008.310
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkiist, Version 21.0, 3 September 2007
SECTION 4 Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME
41
Is any of the proposed operational work assessable under a planning scheme?
C1 No - (Go to Question 4.2 below
{J Yes - (Complete Part E of IDAS Application Form 1 and Questions 4.1.1 ~ 4.1.8 below)
STATE-CONTROLLED ROAD
444
Is any part of the premises within 100m of a State-controiled road, or part of a future State-controlled road?
C) No
no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold?
1 No
(Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
0 Yes
If yes, is all of the proposed operational work associated with the following?
e —Amaterial change of use that is assessable under the planning scheme LNo D Yes
— Reconfiguring a lot that does not increase the total number of lots and does not 0 No (CD Yes
increase the total number of lots abutting the State-controlled road
if no to elther or both - Answer (a) - (c) below
{a) ey of the proposed operational work associated with access to a State-controlled road?
No
(0 sYes - This apptication must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(b) s any of the proposed operational work for filling or excavation?
O1' No
0 Yes
Ifyes, is the operational work proposed in a future State-controlled road defined by route?
oO No - This application must be referred to the Department of Main Roads (DMR) as Advice Agency.
{1 Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625em* that directs stormwater to a State-controlled road?
OO No
DO Yes
Ifyes, is the operational work proposed in a future State-controlied road defined by route?
(0 No- This application must be referred to the Department of Main Roads (DMR) as Advice Agency.
(Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Regulation, schedule 2. table 3, item 3
JP Regulation, schedule 2, table 3, item 1{b)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0310 - MCU - Wellbeing Type 2 - Social [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.