08/0310 - MCU - Wellbeing Type 2 - Social [As Published] · 132008.310

of 89

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkiist, Version 21.0, 3 September 2007
\fyes, is any of the proposed tidal work for a marina with more than 6 vessel berths?

(1 ___No- Unless the application is consistent with any property development plan applying to the land,
the Assessment Manager must refuse to receive it (Complete Part P) This application must
be referred to Queensland Transport (Maritime Safely Qi) as Concurrence Agency.
Subject fo the declaration for the relevant wild river area, the application also requires
assessment for the purposes of the Wild Rivers Act 2005.

(Yes -— Unless the application is consistent with any property development plan applying to the
fand, the Assessment Manager must refuse to receive it (Complete Part P) This
application must be referred to Queensland Transport (Maritime Safety Qid) as
Concurrence Agency and Qid Fire and Rescue Service as Advice Agency. The application
also requires assessment for the purposes of the Wild Rivers Act 2005.

 

0 No
lino, is any of the proposed tidal work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
C) Yes

it yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?

1 No-An application for the operational work would be taken to be not properly made and the Assessment
Manager must refuse to receive it.
OO Yes

If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?

(1) No = Unless the application is consistent with any property development plan applying to the land, the
assessment manager must refuse to receive it (Complete Part M) This application requires
assessment by the Environmental Protection Agency (EPA), if EPA is not the Assessment Manager
for the application, the agency has jurisdiction as Concurrence Agency. The application also requires
assessment by Queensland Transport (Mantime Safaty Qld) as Concurrence Agency and, subject to
the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act
2005. .

| Yes - Unless the application is consistent with any property development plan applying to the land, the
assessment manager must refuse to receive it (Complete Part M) This application requires
assessment by the Environmental Protection Agency (EPA). if EPA is not the Assessment Manager
for the application, the agency has jurisdiction as Concurrence Agency. The application also requires
assessment by Queensiand Transport (Maritime Safety Qld} as Concurrence Agency and Qld Fire
‘and Rescue Service as Advice Agency, Subject fo the declaration for the relevant wild river area, the
. application also requires assessment for the purposes of the Wild Rivers Act 2008.
(0 No
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
O No - (Complete Parl M) This application requires assessment by the Environmental Protection Agency
(EPA). If EPA is not the Assessment Manager for the application, the agency has jurisdiction as

Concurrence Agency. The application also requires assessment by Queensland Transport (Maritime
Safety Qid) as Concurrence Agency. '

(J Yes - (Complete Part M) This application requires assessment by the Environmental Protection Agency
(EPA). if EPA is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency. The application also requires assessment by Queensland Transport (Maritime
Safety Qid) as Concurrence Agency) and Qld Fire and Rescue Service as Advice Agency.

(b) Is any of the proposed tidal work to be carried out in one or more of the following tidal areas?
© — One only local goverment tidal area CINo [Yes

© — Starting in one focal government tidal area and extending into another local LINo (1) Yes
government tidal area (but in no strategic port tidal area)

« — In two or more loca! government tidal areas but not starting in either local govemment Lino (1) Yes

tidal area
© — One only strategic port tidal area (No [) Yes
¢ A tidal area that is not a strategic port tidal area or a local government tidal area LINo (Yes

IPA, schedule 8, part 1, table 4, item §

JP Regulation. schedule 2, table 2. tems 12, 14 and 17

JP Regulation. schedule 1. part 3, table 4, tems 4A and 5

Coastal Protection and Management Act 1995, section 104A (wild river area)

 

 

 

 

-37-

Used in these records

About this file

File size
4.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0310 - MCU - Wellbeing Type 2 - Social [As Published].pdf · 4.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.