Council archive · source document
08/0310 - MCU - Wellbeing Type 2 - Social [As Published] · 132008.310
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkkst, Version 21.0, 3 September 2007 REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILO RIVER AREA 4.14 is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994? 0 No 0 Yes If yes, indicate what the proposed operational work is reasonably necessary for (Tick applicable box/es) ¢ The removal, destruction or damage of dead marine wood on unallocated State land, Ono (Yes other than in a wild river area, for trade or commerce e The maintenance of existing structures, including, for example, the following LINo [Yes structures, if the structures were constructed in compliance with ail the requirements, under any Act, relating to a structure of that type — + — boatramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and weirs; « — existing drainage structures; « — existing powerlines or associated powerline infrastructure +. For educational or research purposes or for the monitoring the impact of development [] No (J Yes on marine plants © — Other purposes CONo (Yes Ifyes to “other purposes”, is that proposed operational work to be carried out in a wild river area declared under the Wild River Act 2005? . [C1 —_No-~ (Complete Part O2) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F), If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Ol sYes . Ifyes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005? oO Yes — Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive it. (Complete Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. me) If no, is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or infrastructure required to support other development for which a development permit is not required or, if a development permit is required, the permit is held or has been applied for? oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive it. (Complete Part O2) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if DPI&F is not the Assessment Menager for the application, the agency has jurisdiction as Concurrence Agency. (___No- An application for the operational work would be taken to be not properly made and the Assessment Manager must refuse to receive it. IPA, schedule 8, part 1, table 4. item & IPA, schedule 8, part 2, table 4, item 4 IP Regulation, schedule 2, table 2. item 29 IP Regulation, schedule 1, part 3, table 4. item 8 Fisheries Act 1994, section 7608 (wild river area) Wild Rivers Act 2005, section 43A -M-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0310 - MCU - Wellbeing Type 2 - Social [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.