Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

08/0310 - MCU - Wellbeing Type 2 - Social [As Published] · 132008.310

of 89

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1897 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

DECLARED FISH HABITAT AREA; WILD RIVER AREA

 

4.13

ls any of the proposed operational work to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994

(0 No

C1 Yes

If yes, indicate what the operational work is reasonable necessary for (Tick applicable box/es)
e The maintenance of existing structures, including for example the following structures, [] No (J Yes

if the structures were constructed in compliance with all the requirements, under any
Act, relating to a structure of that type —

+ — Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming
enclosures and weirs;
» — Existing powerlines or associated powerline infrastructure
© Educational or research purposes relating to the fish habitat area Ono TC Yes
¢ — Monitoring the impact of development on the declared fish habitat area ClNo (Yes

© — Other purposes CINo [7 Yes

if yes to “other purposes’, is that proposed operational work to be carried out in 2 wild river area declared under
the Wild Rivers Act 2005?

(0 ___No- (Complete Part 02) This application requires assessment by the Department of Primary Industries and Fisheries
(DPI&F). If DPI&F is not the Assessment Manager for the application, the agency will have jurisdiction as
Concurrence Agency. '

Ol Yes
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?

(Yes - Unless the application is consistent with any property development plan applying to the land, the
Assessment Manager must refuse to receive it. (Complete Part O2) This application requires assessment
by the Department of Primary industries and Fisheries (DP!&F) and assessment for the purposes of the
Wild Rivers Act 2005. if DPI&F is not the Assessment Manager for the application, the agency has
jurisdiction as Concurrence Agency.

 

 

a WO
If no, is any of the proposed operational work to be carried out in a wild river high preservation area?

Oo No — Unless the application is consistent with any property development plan applying to the land, the
Assessment Manager must refuse to receive it. (Complete Part O2) This application requires
assessment by the Department of Primary Industries and Fisheries (DPI&F) and, subject to the
declaration for the relevant wild river area, assessment for.the purposes of the Wild Rivers Act 2005.
if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.

oO Yes - An application for the operational work would be taken to be not properly made and the assessment
manager must refuse to receive the application.

IPA, schedule 8, part 1, table 4, item 7

IPA, schedule 8, part 2, table 4, item 3

IP Regulation, schedule 2, table 2, item 25

IP Regulation, schedule 7, part 3, table 4, item 7
Wild Rivers Act 2005, sections 43A

 

 

Fisheries Act, section 76DC (wild river area)

 

Used in these records

About this file

File size
4.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0310 - MCU - Wellbeing Type 2 - Social [As Published].pdf · 4.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.