Extension to Currency Period - Approved REC14 0005 04 {As Published} · REC14/0005.04

of 8

Text shows just the words. Original shows the document exactly as it was published.

                 ENGINEERING
                        External Works
                 7.     Gateway Drive must be upgraded for the length of its frontage to the subject site. The
                        works must be undertaken in accordance with an Operational Works approval and must
                        include in particular the construction of a pedestrian footpath in accordance with the
                        conditions of this Decision Notice. This condition is imposed pursuant to s665 of the
                        Sustainable Planning Act 2009 being non-trunk infrastructure.
                        Pedestrian and Bicycle Facilities
                 8.     Pedestrian and bicycle facilities must be provided for the development. The works must
                        be undertaken in accordance with an Operational Works approval and must include in
                        particular a 2 metre wide footpath within the road verge extending from the end of the
                        existing pathway in Gateway Drive to the northern boundary of proposed Lot 103. This
                        condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-
                        trunk infrastructure.
                        Stormwater Drainage
                 9.     The site must be provided with a stormwater drainage system connecting to a lawful
                        point of discharge. The works must be undertaken in accordance with an Operational
                        Works approval and must include in particular:
                        (a) A connection point for the future development of proposed Lot 103 to the existing
                              stormwater drainage system
                        (b) The retention of the existing overland flowpath that conveys stormwater runoff
                              from the adjoining property (Lot 26 SP151406) through proposed Lot 103. The
                              flows must be contained and conveyed wholly within a combined drainage solution
                              consisting of underground drainage, capable of accommodating flows up to a Q10
                              event, and a landscaped and suitably stabilised (rock lined or other engineered
                              alternative) open drain. The design of the drain must be sufficient to include all
                              design storm events up to and including the 1%AEP event of critical duration.
                              Design calculations (that include at a minimum depth of flow and velocity) and
                              certification by a suitably qualified RPEQ demonstrating the above must be
                              submitted as part of the operational works application
                        (c) Additional elements in the design of the open drain (localised bunding etc) that
                              allows stormwater flows from the minor storm event to enter the existing piped
                              system and ensure that velocities (generated in both the major and minor events)
                              are in accordance with the safety guidelines recommended in QUDM.
                        Electricity and Telecommunication Services
                 10.    Underground reticulated electricity and telecommunication services must be provided to
                        each lot in accordance with an approval for Operational Works and the standards and
                        requirements of the relevant service provider.
                 11.    Unless otherwise stipulated by telecommunications legislation at the time of
                        construction, the development must be provided with all necessary conduits, pits and
                        pipes to accommodate the future connection of optic fibre technology
                        telecommunications.
                 12.    Certification must be submitted to Council from all relevant service providers which
                        certifies that the development has met the requirements of this Decision Notice and all
                        applicable legislation at the time of construction.
                        Easements
                 13.    A drainage easement must be created within proposed Lot 103. The easement must be:




Document Set ID: 23331562
Version: 4, Version Date: 04/11/2024                                                                   Page 3 of 8

Used in these records

About this file

File size
195 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Extension to Currency Period - Approved REC14 0005 04 {As Published}.pdf · 195 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.