Council archive · source document
Extension to Currency Period - Approved REC14 0005 04 {As Published} · REC14/0005.04
(a) Of sufficient width (approximately 4.5m) to encompass all elements of the
combined underground pipe and open drain solution (underground pipe (Q10
flows), batters, bunds, etc. and a 1.5m maintenance track),
(b) In favour of Lot 26 SP151406 to connect to a legal point of discharge as defined
in QUDM.
(c) Alignment of the underground pipe, open drain, and easement is to be determined
through operational works application (as per condition 9(b) above).
14. A drainage easement must be created within proposed Lot 101. The easement must be:
(a) In favour of Lot 26 SP151406 and proposed Lot 103,
(b) Centrally located over the existing piped drainage system connecting proposed
Lot 103 and Lot 26 SP151406 to the existing stormwater discharge point in
Gateway Drive.
15. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
16. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
17. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
18. All fill and associated batters must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless written permission
from the respective landowner(s) is provided to Council.
19. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
walls that are publicly accessible and exceed 1.0m in height must be fitted with a
commercial grade safety fence.
Damage to Services and Assets
20. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
(a) where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
(b) where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
UNITYWATER
Important Advisory Note - The following Unitywater conditions are applied in accordance with
the Chapter 4c, part 7 and sections 135 and 140(c) South East Queensland (Distribution and
Retail) Restructuring Act 2009 and Unitywater’s Interim Connections Policy. The conditions
below form part of a water connection aspect which are taken to be a water approval for a
staged connection. You are entitled to appeal against the water connection aspects of this
application in accordance with section 99BRAY and Chapter 4c, part 4, Divisions 1 and 2
of the South East Queensland (Distribution and Retail) Restructuring Act 2009. Unitywater
can be contacted as follows:
Phone: 1300 0 Unity (1300 086 489)
Document Set ID: 23331562
Version: 4, Version Date: 04/11/2024 Page 4 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Extension to Currency Period - Approved REC14 0005 04 {As Published}Related documentApplication case desk ↗
About this file
- File size
- 195 KB (small file)
- File type
No other editions are linked here.