Original source · versioned page text
planning application 3 werin dual occupancy
ww PIVOTAL Development Application Planning Report Material Change of Use for Dual Occupancy, associated Operational Works and Reconfiguring a Lot (1 lot into 3 community title) situated at 3 Werin Street, Tewantin (Lot 4 on RP91287). we | at ——— tf | Ser wr A ¥; 2, Sal Page 1 of
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of the other 16 pages
Page 2
ww PIVOTAL Contents Development Application Planning Report.............sssccccssssssccssssssscecssssscesesssssceeessssnceseessssosseesssneesecessneeees 1 SUIMMM AL). .......ssccsssssssssssssssessssceseceesecessesecesccsecessscnscanocsccascssscssscsssssessesssesessesscesesesecsesseseceaesesessaoasoossoassensnees 3 1.0 Development application details ....................::::sssseesseeseeeeeeeeeeeeeeeeeeeeeeeeeeseseceeesocesceeececeeeseeassssseeeseeens 3 1.1 Planning instrument details................::::ssccesseesssssseseseseseeeeeeeeeeeeeeeeeeeneceaeeceaacecccccssecessoescecseesseeeseoeeens 3 1.2 Referral AZENGES ..........cccccccccscceetterteteneessessssssssscssecseesseessceceeseeeeeeeceescessceaacecececesasouscasscuseessseesseeeeees 3 2.0 Site details ...........csssccccssssscescessssesecssssseccessssscesssssnrsssessssnceesesssseessesscsessssesansesssssseesessssscessesssceesesesnes 4 2.1 Site AESCrIPTION................ccccosssccccsseccesssecccsssccceeeseccesescscuaseeccusseeeuaseescuaseceueceesceeseceeeesesenenseesogseseeeenes 4 2.2 Surrounding land USES..............cccssssecccsssscccsssccossceccnacscccnssseccceeseccesececeaesecsnsseccuassseeneessuaceessaeesceeouses 6 3.0Proposed development details.............:sscccsssssccccsssssscesssssscesesssnncesenssnsceeseesneeeeeesssneeeeessnsceseeseasaeeeeseeaes 7 4.0 Planning aSSCSSMENL ..........s:ssscccccccccssssssssssssccccccesesssssssscceesceesecsesessssnaaeeesecssecessnssnaaeoosseeceessessessnaooess 8 4.1 Technical COMPI]IANCE................ssccccsssscccccessssecccesssscescessaneceecssscecesesssaeeesensenseseessneeseesssseeeessssaecessnsaaes 9 4.2 Building Design .................sssssssscccccceceeessssssssscccccceeeeensssscnsacecscceeeeeessssssaseceeseeeeeeeanessscaneeceseeeseasesssaaes 10 4.3 Sustainable Building Design Code...............ssscccccccssssssssssssssscccccessssssssnsceseceeeceesessssssnsceseeeeeeesssessaaes 13 4.4 Reconfiguring a lot (1 lot into 3 lots) 0... ee ssssseessecsceeessecssccesceeseccesceesscessecesscesscesesseessesseeeseeess 14 4.5 Works and Overlay Codes............ccccccssssssssssscccccceccesssssssscccccecesesessnsssssascssceeseesensesssaceseceseesessessssnaas 15 5.0 State assessment and other Mattels............scccssssccccsssssccsssssnscesessseescesssscessesssssseeseessneeessssnaeeeseseas 15 5.1 State interests...........cccccsssssccscccsccssssesssssccsccecesscsssssssnscssccesscsscesssssssscssesesecscssesesssseccsecssesscssssssaecseeers 15 Matters established in the Planning REgulation...............ccccccccccccessseeeceeceesseeeseeceeeeeeseeeseeeesesaeeeeeeeseasaaes 15 State Planning Policy ..........ccccccccccseseeeeeceee ee eeeeeeeeeeeeeeeeeeeeeeeesae ee eeeEAGAAAAEESEE;;;;SAASEEEESEEEG OAS EEEEEEEEE AA AOEEEEEEEEE 15 6.0 CONCIUSION.............:cccsscccssscesssscccesscesesnsccsssccsesscsesscessesscesssaesesssssesssceesssesessnsesesscesssnessssnesessnsesssesesesnes 17 Client Name: lan Jensen Prepared by: Jack Lewis B.Sc Hons UNSW, M.Plan OTAGO RPIA Version: 1 Date: 1 August 2024 This report is based on the QLD Government’s planning report template (Department of Infrastructure, Local Government and Planning), which adopts a ‘report-by-exception’ approach. The planning report only discusses the key issues and matters where a proposed development does not exactly meet the requirements of, or conflicts with, a planning scheme or other planning instrument. Disclaimer: While every care has been taken in preparing this report, Pivotal Perspective Pty Ltd accepts no responsibility for decisions or actions takenas a result of any data, information, statement or advice, expressed or implied, contained within. To the best of our knowledge, the content was correct at the time of publishing. Page 2 of
Page 3
Summary 1.0 Proposed development: Type of approval sought: Site address: Real property description: Cultural Heritage and ELA Zoom aC Owner details: Applicant details: 1.1 State planning policy: Regional plan: Designation: Planning scheme: Level of assessment: Applicable overlays: Applicable codes: 1.2 Nil 4 PIVOTAL Development application details Dual Occupancy, associated Operational Works and Community title subdivision Development Permit for Material Change of Use Development Permit for Operational Works (Engineering, Earthworks, Landscaping, Stormwater, Driveway and access) Development Permit for Reconfiguring a Lot (1 lot into 3 lots) community title 3 Werin Street, Tewantin Lot 4 RP91287 734m2 Noosa Council Kabi Kabi First Nation Traditional Owners - There are no Aboriginal or Torres Strait Islander cultural heritage sites identified on the DATSIP database pertaining to this location. JIG Investments Pty Ltd JIG Investments Pty Ltd c/- Pivotal Perspective Pty Ltd Planning instrument details State Planning Policy 2017 Shaping SEQ, South East Queensland Regional Plan 2023 - Urban footprint designation. The Noosa Plan 2020 Medium Density Residential zone Code Nil Tewantin Local Plan Code Medium Density Residential Zone Code Dual Occupancy and Multiple Dwelling Code Works codes Referral agencies Page 3 of
Page 4
PIVOTAL 2.0 Site details 2.1 Site description Table 1: Site description Site Description characteristics Existing land use Dwelling house Frontage and 18.3m to Werin Street access Topography and The site slopes moderately from north to south with approximately 1m of slope. views Figure 1 below shows a contour and detail survey of the lot. le : ml = XS co ae es = sor | 3 * B 5 = =, \r aL eee —- . ee 4 s Y Lot 4RPstz 3 = ZB t 3 Wenn Same eucl Pe Area T34m2 “4 . 438 ain t Floor 12 43 - 52 : a 4 Fey + Pe # yes W =F a | | | —eE | — ———- _ —z = = Ze en ee ee Pt “Praeee at Figure 1 - Contour and detail survey Existing Scattered urban garden vegetation and a large mango tree to the northeastern vegetation corner of the lot which is proposed to be removed. A Poinciana is in the road reserve near the southern boundary. Page 4 of
Page 5
ww PIVOTAL Figure 2 - Aerial view and site identification Figure 3 - Street view of the existing dwelling Page 5 of
Page 6
PIVOTAL 2.2 Surrounding land uses Table 2: Surrounding land uses Surrounding land uses North Battle axe driveway handle and Multiple dwellings South Dual occupancy East Dwelling house in Medium density residential zone West Across Werin Street, dwelling houses 3 Zones Low Density Residential MB Medium Density Residential WB High Density Residential WH Tourist Accommodation Wl Major Centre MM District Centre MH Local Centre Neighbourhood Centre Low impact Industry MP Medium impact industry Recreation and Open Space WB Environmental Management and Conservation [([) Community Facilities WE Innovation Rural Figure 4 - Zone map Page 6 of
Page 7
3.0 Proposed development details Table 3: Summary of development aspects Material change of use Building height 8m Gross floor area 0.4:1 Site coverage 40% Car parking 4 covered spaces Site access Werin St — Local Road a AV/ Road Hierarchy AV Aneriat AV Distributor AV Collector Locat Figure 5 - Identification of road hierarchy. Source - Noosa Enterprise Mapping System The application proposes a dual occupancy, with the following features: e Awell designed and orientated dual occupancy by renowned architect Kidd and Co e Dwelling house typology presentation to the street; e Both dwellings orientated to the north including outdoor areas e One driveway to the southern side of the site; e No garage presentation to the street; e Well-articulated elevations e = A variety of external finishes; e Garaging, storage and laundry in a basement configuration; e Three bedrooms, office space and associated balconies on the ground floor and outdoor recreation area including swimming pool; e _ Living spaces, terraces and master suite on level 1; e Tewantin look and feel with a pitched roof and hip ends; e Privacy between dwellings and neighbouring properties; e No overlooking of neighbouring properties; e Large LOS and POS with covered BBQ; e Private roof terrace; e Significant soft landscaping; e Significant landscaping to the full perimeter of the site; e Approval also sought for Operational Works (Landscaping, Access, Car parking, Earthworks, Stormwater); and e —Reconfiguring a lot (1 lot into 3 lots) for community title. A copy of the proposed Site plan and Section plans provided in the Figures below. Page 7 of
Page 8
B x 2 = = oo” 4 Figure 6 — Proposed Site Plan Figure 7 - Section Plans 4.0 Planning assessment Page 8 of
Page 9
4.1 Technical Compliance The proposed Dual occupancy meets the relevant key technical provisions of the Medium Density Residential and Multiple Dwellings Codes, as described below, with further discussion provided thereafter. Site Details 3 Werin St —734m? Height 8m and 2 storeys 8m and 2 storeys Y Site Cover 40% overall (293.6m7) 40% (293m?) Y Plot ratio/GFA | 0.4:1 (294m?) 0.4:1 (294m2) (0.4:1 294m?) Y Private Open Ground Level (25m2) >25m2 Y Space Setbacks Frontage - Frontage (6m) Eave — 5.4m PO Main building - 6m Y - basement — north (6m) 11.2m Y Side - north (1.5m — 2m) 2.4m Y - south (1.5m - 2m) 3.3m Y - basement — north (1.5m) 1.85m Y - basement - south (1.5m) 4.8m Y Rear - rear (6m) Eave - 4.6m PO Main building — 5.2m PO - basement (6m) 8.4m Y Wall length <15m <15m Y Garages Garage doors facing the street) No garage doors face the street | Y are separated by 2m or are staggered by 1m. Garage doors are no greater than 6m in width or no greater than Y 50% of the lot width (8.5m max.) Roof Form Rooftop Terrace Small Roof terrace PO Landscaping 40% of site (293.6m2) 49.6% (364m?) Y With 60% of this to be soft) 330m? (95.6% soft) Y landscaping (176m?) Carparking 2 covered and 1 additional 4 covered spaces Y and access Waste Storage | Screened waste areas and] Bin storage is within the Y located for transport to kerb with} basement with sufficient space’ grade of <1:15 for 3 bins per dwelling Fencing Setback average of im andj This can be conditioned to Y articulated by stepping the design.) comply Page 9 of
Page 10
The proposal fully complies with all the key development parameters except for setbacks and roof form where assessment against the associated Performance outcome is required. 4.2 Building Design General The proposed dual occupancy design is finished with an attractive built form which addresses the street and contributes positively to the surrounding development on Werin Street. The design incorporates a mix of materials to add visual interest in accordance with the requirements of the Medium Density Residential Zone code. This is achieved through variations in plane and the use of a variety of external finishes. The design will be finished with high quality landscapes and useable communaland open space area. The design also contributes positively to the whole locality, complements the existing streetscape and does not present bulky given the proposed architectural design elements of glazing and the chosen use of structural materials. The garages are in a basement with the entry to the southern side which, unlike many basement entries, the proposal results in a 2 storey presentation to the street and surrounding properties. No garage doors face the street and given the units run longitudinally east west, the proposal presents as a single dwelling to the street. The roof is pitched providing a modern roof form reminiscent of the heritage values of Tewantin. Soft landscaping exceeds the required 60% of the total landscaping setout by the Code (>90%), with the development proposing generous soft landscaping within the frontage, to the rear and along the side of the driveway. While vehicles can enter and exit the site in a forward, Werin Street is a Local Road and leaving in a forward gear does not apply. Page 10 of
Page 11
Setbacks Acceptable outcome AO12.1 seek buildings and structures are setback 6m from the front and rear boundaries. The proposal seeks a setback of 5.4m to the eave of the front elevation and 4.6m to the eave of the rear boundary. Accordingly, an assessment is required against the corresponding PO12 which is provided below. Building Setback PO12 Buildings and structures are designed and sited to: (a) provide a high level of amenity to users of the subject site and adjoining premises, including provision of visual and acoustic privacy; (b) not unreasonably obstruct views or cause overlooking of private open space or habitable areas of adjoining premises; (c) provide adequate distance from adjoining land uses; (d) preserve existing vegetation that will help buffer development; (e) allow for space and landscaping to be provided between buildings including adequate area at ground level for landscaping with trees, shrubs, outdoor living and utilities; (f) be consistent with the predominant character of the surrounding area; and (g) protect the natural character and avoid adverse impacts on ecologically important areas such as national parks, waterways and wetlands. The proposed setbacks fully comply with PO12 for the following reasons- Front — the building is compliantly setback with the eave not causing any impacts given it is to the frontage and unlikely to be noticeable from the street. The setback is consistent with other setbacks in the street as the superseded planning scheme permitted eaves to encroach within the 6m setback. Rear — While the rear deck extends slightly into the setback, no additional overlooking will occur when compared to if the deck were setback 6m. In addition, the area that is potentially overlooked of the neighbouring properties is garaging and driveway where no negative impacts will occur. Front and rear - the variation will not impede views as the property to the east is orientated towards the south to take advantage of the views to Lake Doonella. The multiple dwellings to the north are internally orientated and do not seek views beyond their own boundary. As discussed above, will not cause additional overlooking of neighbouring properties. Front —driveways each side of the subject site provide sufficient separation between land uses. Rear - there is significant separation between land uses where dense landscaping to the perimeter is proposed as shown in the landscaping plan below in Figure 8. Page 11 of
Page 12
Figure 8 - Dense landscaping to rear and side boundaries Roof form Acceptable outcome AO19.2 prefers that development does not include roof terraces. The proposal seeks a centrally located roof terrace per unit as shown in Figure 9 below. Accordingly, an assessment is required against the corresponding PO19 which is provided thereafter. Figure 9 - Roof plan showing roof terrace Roof forms PO19 Roof forms: (a) contribute positively to the local skyline; (b) complement the character of the locality and the topography of the site; (c) avoid box profiles/parapets; and (d) do not create opportunities for overlooking the private open space or internal spaces of neighbouring properties. Page 12 of
Page 13
The proposal fully complies with PO19 for the following reasons- e the proposal includes a traditional pitched roof form which sits nicely into the local Tewantin skyline; e the hip ends, while a modern sleek design characterises Tewantin dwelling typology; e the proposal does not include parapets or box profiles, but is a traditional well-designed Noosa style building with eaves to 100% of the building; and e the proposed roof terraces are centrally located in the roof providing privacy to the residents and the surrounding area as the proposed roof impedes lower level view lines to the south, east and west and allows the view high only to Lake Doonella. To the north, a strategically placed screening device impedes any views in that direction. Notably, the screening device fully complies with building height and does not unlawfully impede any views from neighbouring properties. The following Figures 10 & 11 prepared by the Kidd and Co clearly demonstrate the view from the roof terraces will not overlook the private open space or internal spaces of the neighbouring properties. SECTION 3 SECTION 2 Figure 10 — Section plan showing roof terrace 4.3 Sustainable Building Design Code An assessment against the Performance Outcomes (PO8) of the Sustainable Building Design Code is provided below. Performance Outcome Comment orientates buildings and windows to make the most of prevailing winds, natural ventilation, and cross breezes; The design includes glazing and inside outside connection which allows good flow through ventilation. Kitchen, living and deck areas of both units face north and make use of the winter sun and cooling summer breezes. maximises shade to east and west walls; Eaves, the upper floor and veranda roofs act to shade walls and the orientation minimises the effect of the west afternoon sun. contains an open and permeable built form that connects indoor and outdoor spaces in an integrated design; The design creates good flow and permeability to the large decks which create an inside outside feel to the living areas, particularly the use of glazing enhances the indoor outdoor connection. retains existing vegetation and natural shading where possible; Although not proposing to retain trees, the design proposes large plantings to throughout the site demonstrated by the Page 13 of
Page 14
proposal having significantly more landscaping than that required by the zone code. incorporates passive building design to reduce the need for auxiliary heating and cooling; The architecturally designed Dual occupancy has strategically placed openings, masonry walls and LOS to help with thermal comfort. Both units have north facing POS and LOS to maximise the northern aspect of the lot. uses low toxic internal and external building materials; A mix of low toxic internal and external materials are incorporated for the construction which will ensure long lasting design that does not require regular maintenance. uses natural light rather than artificial light, and may include Skylights, atriums and light wells; Natural light is provided through the strategically located opening and glazing on both levels. provides a minimum floor to ceiling height of 2.7 metres; and The design proposes 2.7m and 3m floor to ceiling heights which will allow for good room air circulation. enables efficient operation and use of the building. The design allows for medium density living and privacy to each of the dwellings, while also allowing for users to easily flow between the main living and bedroom levels. The proposal seeks a community title subdivision for 1 lot per dwelling and a Lot 0 of common property. 4.4 Reconfiguring a lot (1 lot into 3 lots) The proposal complies with the Performance outcomes PO27 — PO29 for the following reasons: The subdivision will occur once construction of the approved buildings is complete; The driveway and entry access are clear statements of design; and The design provides amenity and convenience for the users; The dwellings are a short walk from Tewantin District Centre Zone; Close to all services and facilities in Tewantin including to public transport close by along Poinciana Ave; Is within a Medium Density Residential Zone; Does not appear as a large bulky dual occupancy; The proposal is only seeking a different tenure as in reality the building presents no different to a building unit format plan with exclusive use areas; The dwelling and carparking can be accommodated onsite. In fact, 1 additional car space is provided to that required by the code; Urban infrastructure will be provided; The proposal is in an urban environment and is not negatively impacting on any assessable vegetation; The lots are generally rectangular in shape; and The proposal complies with LOS and POS requirements of the code and therefore by default provides more than reasonable amenity for the residents. Page 14 of
Page 15
e Community title development is common in the surrounding area. i i 20 ae —_ 4.5 Works and Overlay Codes Land subject to acid sulfate soils While the site is affected by Area 2 above 5m AHD, the basement does not trigger thresholds for assessment against the Overlay Code. Works Codes Approval is sought for Operational Works. SCG provides engineering plans and a stormwater design. Detailed landscaping plans prepared by Element Design Landscaped Architecture are also provided as part of the proposal package which includes landscaped area and planting detail for screening vegetation along the side boundaries, front and rear setbacks. 5.0 State assessment and other matters 5.1 State interests Matters established in the Planning Regulation Nil State Planning Policy The SPP includes assessment benchmarks that may be applicable where a local government planning scheme does not adequately reflect the SPP. The Noosa Plan 2020 appropriately integrates all SPP Page 15 of
Page 16
provisions, except for Natural Hazards, risk and resilience — coastal hazards — in part. The application does not trigger assessment against for coastal hazards. Page 16 of
Page 17
ww PIVOTAL ww PIVOTAL 6.0 Conclusion This application seeks a Development Permit for Material Change of Use Dual Occupancy, associated Operational Works (Landscaping, Access, Car parking, Earthworks, Stormwater) and Reconfiguring a lot (1 lot into 3 lots) for community title, situated at 3 Werin Street, Tewantin. The use is a consistent code assessable development within the Medium Density Residential Housing Zone. The assessment finds the design meets the relevant Acceptable and Performance Outcomes. The Planning Act 2016 prescribes that a code assessment must be carried out only— ( a ) against the assessment benchmarks in a categorising instrument for the development (The Noosa Plan 2020); and (b) having regard to any matters prescribed by regulation. Council, after carrying out the assessment— (a) must decide to approve the application to the extent the development complies with all of the assessment benchmarks for the development; and (b) may decide to approve the application even ifthe developmentdoes not comply with some of the assessment benchmarks; and Examples— 1 An assessment manager may approve an application for development that does not comply with some of the benchmarks if the decision resolves a conflict between the benchmarks. 2 An assessment manager may approve an application for development that does not comply with some of the benchmarks if the decision resolves a conflict between the benchmarks and a referral agency’s response. (c) may impose development conditions on an approval; and (d) may, to the extent the development does not comply with some or all the assessment benchmarks, decide to refuse the application only if compliance cannot be achieved by imposing development conditions. Example ofa development condition— a development condition that affects the way the development is carried out, or the management of uses or works that are the natural and ordinary consequence of the development, but does not have the effect of changing the type of development applied for The assessment finds the development generally complies with all Acceptable Outcomes of the applicable codes. The Assessment Manager’s favourable consideration of the above development application is therefore recommended. Page 17 of 17