Council archive · source document
RFI - Attachment D - Geotechnical Investigation Report · MCU25/0053
Page : 12 of 17 Work Order : EB2502462 Client : PTG Consulting Pty Ltd Project : PTG/01608 7 Noosa Pde Analytical Results Sub-Matrix: SOIL Sample ID BH3 2.25- 2.5 BH3 2.5 - 2.75 BH3 2.75 - 3.0 BH3 3.0 - 3.25 BH3 3.25 - 3.5 (Matrix: SOIL) Sampling date / time 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 Compound CAS Number LOR Unit EB2502462-046 EB2502462-047 EB2502462-048 EB2502462-049 EB2502462-050 Result Result Result Result Result EA003 :pH (field/fox) pH (F) ---- 0.1 pH Unit 6.5 6.5 6.6 6.5 6.1 pH (Fox) ---- 0.1 pH Unit 3.4 3.3 3.3 3.1 2.5 Reaction Rate ---- 1 Reaction Unit 2 2 2 2 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment D - Geotechnical Investigation Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.