Council archive · source document
RFI - Attachment D - Geotechnical Investigation Report · MCU25/0053
Page : 13 of 17 Work Order : EB2502462 Client : PTG Consulting Pty Ltd Project : PTG/01608 7 Noosa Pde Analytical Results Sub-Matrix: SOIL Sample ID BH3 3.5 - 3.75 BH3 3.75 - 4.0 BH3 4.0 - 4.25 BH3 4.25 - 4.5 BH4 0.0 - 0.25 (Matrix: SOIL) Sampling date / time 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 Compound CAS Number LOR Unit EB2502462-051 EB2502462-052 EB2502462-053 EB2502462-054 EB2502462-055 Result Result Result Result Result EA003 :pH (field/fox) pH (F) ---- 0.1 pH Unit 6.3 6.5 6.3 6.4 6.8 pH (Fox) ---- 0.1 pH Unit 2.5 2.1 2.3 2.4 4.2 Reaction Rate ---- 1 Reaction Unit 3 4 4 4 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment D - Geotechnical Investigation Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.