Council archive · source document
RFI - Attachment D - Geotechnical Investigation Report · MCU25/0053
Page : 15 of 17 Work Order : EB2502462 Client : PTG Consulting Pty Ltd Project : PTG/01608 7 Noosa Pde Analytical Results Sub-Matrix: SOIL Sample ID BH4 1.5 - 1.75 BH4 1.75 - 2.0 BH4 2.0 - 2.25 BH4 2.25- 2.5 BH4 2.5 - 2.75 (Matrix: SOIL) Sampling date / time 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 Compound CAS Number LOR Unit EB2502462-061 EB2502462-062 EB2502462-063 EB2502462-064 EB2502462-065 Result Result Result Result Result EA003 :pH (field/fox) pH (F) ---- 0.1 pH Unit 6.7 6.7 6.6 6.5 8.6 pH (Fox) ---- 0.1 pH Unit 4.1 3.5 3.4 3.7 5.5 Reaction Rate ---- 1 Reaction Unit 2 2 2 2 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment D - Geotechnical Investigation Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.