Council archive · source document
RFI - Attachment D - Geotechnical Investigation Report · MCU25/0053
Page : 16 of 17 Work Order : EB2502462 Client : PTG Consulting Pty Ltd Project : PTG/01608 7 Noosa Pde Analytical Results Sub-Matrix: SOIL Sample ID BH4 2.75 - 3.0 BH4 3.0 - 3.25 BH4 3.25 - 3.5 BH4 3.5 - 3.75 BH4 3.75 - 4.0 (Matrix: SOIL) Sampling date / time 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 Compound CAS Number LOR Unit EB2502462-066 EB2502462-067 EB2502462-068 EB2502462-069 EB2502462-070 Result Result Result Result Result EA003 :pH (field/fox) pH (F) ---- 0.1 pH Unit 7.7 8.6 8.5 8.9 4.0 pH (Fox) ---- 0.1 pH Unit 2.8 3.0 3.6 5.7 6.0 Reaction Rate ---- 1 Reaction Unit 3 2 2 2 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment D - Geotechnical Investigation Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.