Original source · versioned page text
2016-08-09 Planning & Environment Committee Agenda
The original of this document is very large (15.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 AUGUST 2016
Building Height
5. The maximum height of the development must not exceed the Reduced Levels (RL) indicated
on the approved plans.
6. Certification must be submitted to Council from a Licensed Surveyor which certifies that the
building does not exceed the maximum height requirement of this Decision Notice.
Performance Bond
7. Security in the form of a cash bond or trading bank guarantee to the sum of $25,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to
requesting the pre-start meeting. The cash bond or trading bank guarantee will be returned
on performance of the conditions of approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Street Identification
8. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate, the
building name.
Nature and Extent of Approved Use
9. The approved use must not operate outside the hours of 6am to 10pm, 7 days per week.
10. Delivery vehicles and associated activities must be limited to between 7:00am to 6:00pm
Monday to Saturday and not permitted on Sunday or public holidays.
Building Appearance
11. The external finishes to the western wall must be in accordance with the approved plans.
The colour scheme of the wall must provide interest, reflect the character of Cooroy and
submitted to Council prior to the issue of an Operational Works approval.
12. All mechanical equipment located on the site must be:
a. located not less than 2 metres from a property boundary
b. fully enclosed or screened such that they are not visible from the street frontages nor
adjoining properties. Where screened by landscaping, landscaping beds must be at
least 1.5 metres wide.
Weather Protection
13. The street awning must be provided as shown on the approved Site Plan. The awning must
be designed to provide solar and rain protection and promote all weather activity.
Landscaping Works
14. The development site must be landscaped. The works must be undertaken generally in
accordance with the approved plans, Planning Scheme Policy PSP 3 Landscaping Plants
and Guidelines and in accordance with an Operational Works approval and must include in
particular:
a. the works shown on the Approved Plans
b. an arborists report that provides the following but not limited to:
i. an assessment of the scope of works around the street trees
ii. a detailed recommendation for the method of construction near the trees to
ensure their health and vigour
c. all street trees must be retained except for the tree proposed to be removed for the
new crossover
Page 48 of 119
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.