Negotiated Decision Notice - 010.2007.00001446.001 [As Published] · 132007.1446
-5-
35. For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development
shall be served by:
35.1. A single Body Corporate water meter to measure the total water consumption (including
fire hose reels, but excluding fire hydrants and fire sprinkler systems), and
35.2. Individual water meters to each tenement capable of being separately rated, and
35.3. A fire service (fully testable single detector check with metered bypass), where
applicable, for flows to fire hydrants and fire sprinkler systems (excluding fire hose
reels).
Earthworks
36. Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s
Engineering Design Standards Manual and so as not to cause the additional ponding of water
on any adjoining lands or the blockage of, or interference with, any natural watercourses.
37. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences and/or structures and/or lands that border the development site.
Site Stability
38. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect the
stability of adjoining buildings and/or structures and/or land, and make recommendations on
the type of foundation system(s) best suited for the proposed development. The
recommendations of this report shall be incorporated into the design and construction of the
proposed development.
Erosion and Sediment Control
39. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Contributions Towards Council Infrastructure
40. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
upgrading various infrastructure at the rates applicable at the time of payment. An estimate
only of the contribution amounts under the current Council policies and requirements is
outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $3,002
PSP16 – Sewerage Headworks Contributions $2,163
PSP17 – Water Supply Headworks Contributions $3,844
PSP20 – Pathway Trunk Network Contributions $1,350
TOTAL Contribution Amount = $10,359
Please note, that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from September 2007 until the date of payment.
5 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice - 010.2007.00001446.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 79 KB (small file)
- File type
No other editions are linked here.