22.   All carparking shall be kept, maintained and sign posted in a condition fit for use.
23.   and any drainage required to drain these areas shall also be shown on the plans.
Frontage Works
24.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the
      Grant frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping
      Plants & Guidelines. Grass shall be couch, free of weeds.
25.   A contribution of $2,970 towards the construction of footpaths in the Grant Street local area
      shall be paid to Council prior to obtaining a Development Permit for Operational Works. This
      amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from
      September 2007 until the date of payment.
26.   All paths, driveways and turning areas shall be designed and constructed to ensure pedestrian
      safety using non-slip materials, to produce an evenly graded surface finish, and to be in
      accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1 Design
      for Access & Mobility.
27.   All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
      footpath paving and landscaping such as trees and grasses in accordance with Council’s
      Standard specifications prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
28.   Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank
      (minimum storage 3000 litres per attached dwelling/unit) that is installed to ensure water from
      the tank is used for external uses (such as watering gardens, irrigation, ornamental ponds,
      water features, topping-up swimming pools, outdoor cleaning, etc) and for use in flushing of
      toilets internal to the dwelling.  All rainwater tanks are to be designed and installed in
      accordance with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks, and
      shall be part of the plumbing application in conjunction with the building approval. The
      location and capacity of the tanks shall be clearly shown on the plans submitted for Building
      Works / Operational Works approval and any overflow shall be directed to the stormwater
      drainage system.
29.   All stormwater drainage (including roof water overflow from the rainwater storage system)
      shall be collected and discharged so there is no net increase in stormwater runoff from the
      site. Stormwater drainage permitted to drain from the site shall be discharged to Council’s
      existing drainage structures at the rear of the site. Plans of the drainage design shall be
      prepared by a Registered Professional Civil Engineer and submitted to Council prior to
      obtaining a Development Permit for Operational Works.
30.   All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
31.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
32.   The site shall be connected to Council’s existing town water supply and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.
33.   Each individual water connection to the water reticulation system shall extend to the property
      boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
34.   All water meters must be located outside the property boundary and in an easily assessable
      location to facilitate unhindered reading by Council and/or Council’s contracted water meter
      readers, and not behind fences or locked gates. In this regard approval of the water meter
      configuration and location must be obtained from Council’s Water & Sewerage Capital Works
      Manager prior to lodgement and approval of hydraulic drawings.
                                                                                               4 of 13

Used in these records

About this file

File size
79 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Decision Notice - 010.2007.00001446.001 [As Published].pdf · 79 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.