Landscape Plans
DRAWING SCHEDULE MATERIALS & FINISHES SCHEDULE
24228 CD-000 COVER SHEET CODE / ITEM MANUF. REQUIREMENTS
TE
24228 CD-001 SPECIFICATION NOTES
24228 CD-002 SPECIFICATION NOTES & PLANTING SCHEDULE
th
nc
. pa 24228 CD-100 SURFACE FINISHES PLAN - GROUND FLOOR
co
24228 CD-101 SURFACE FINISHES PLAN - FIRST FLOOR Turf Type 1 (T1) A-Grade Couch 'Wintergreen' Laid as per detail shown on CD-200.
TE
24228 CD-200 PLANTING PLAN - GROUND FLOOR Turf Type 2 (T2) Kombo Grass Comfort 30 Artificial Grass - mould resistant and heat reducing with no-sand infill design. Artificial Grass laid as per manufacturers
conc. path
24228 CD-201 PLANTING PLAN - FIRST FLOOR Ph: 1300 456 626 specifications. Refer to detail CD-200.
SV
24228 CD-300 CONSTRUCTION DETAILS
FH
24228 CD-301 CONSTRUCTION DETAILS Garden Bed Type 1 Internal grade typical, 300mm depth imported topsoil to specification. Cover with 100mm thick Hoop Pine Mulch. Refer to detail
103 24228 CD-302 CONSTRUCTION DETAILS (GB1) CD-200.
SMH
SV
Garden Bed Type2 All podium garden areas are specified to use Fytogreen’s Hydrocell 40 Lightweight Planting Media, cover with 100mm thick Hoop
conc
103
LI
(GB2) Pine Mulch (without fines 25mm), refer to detail CD-200.
. path
CD-100
fieldpit LI
path EPL
conc. transformer
Garden Bed Type 3 200mm depth site topsoil to specification. Install jute mesh laid over mulch on batters. Lay across slope and pin at twice
EP #96905
103 (GB3) for Stormwater recommended rate to prevent the mesh from lifting. Mulch to be aged forest mulch with a combination of bark, twigs and chips
Easement and maximum 10% fines.
CD-200 104
10
4
106 105
field pit
Garden Edge Type 1 Littlehampton Clay Bricks Brick edging. Original Adelaide Red Commercial size pavers laid lengthways on side to provide 30mm edge profile. Set in mortar
900
Community Stormwater
(EG-1) and Pavers haunch laid on compacted roadbase with 10mm mortar gap between pavers. Mortar to be cream/buff colour. Set flush with
treatment device Ph: 1300911855 adjoining surfaces.
106
Wicking Beds (V-1) Foley’s Tanks Wombye Round Garden Beds, 1.5 Metre Diameter, 0.8m height. Colour: Woodland Grey. Construct as wicking garden bed. Premium quality
/
//
//
//
//
//
//
//
//
10
Ph: 5442 1409 landscape soil, 75mm depth sugar cane mulch. Refer detail drawings.
/
4
/
//
//
//
103
//
/
107
108
Wicking Beds (V-2) Foley’s Tanks Wombye Oval Garden 2.2m long x 1m wide, 0.8m height. Woodland Grey. Construct as wicking garden bed. Premium quality landscape
/
Sill 1,000
W-a/05
104
Ph: 5442 1409 soil, 75mm depth sugar cane mulch. Refer detail drawings.
/
/
/
108
109
Seating Type 1 (S1) Gossi Park & Street Gossi Park Riverside Monaco Seat Range. 1800mm Seat with back and armrest Slats to be clear anodised finish. Legs surface
/
/
SMH
Furniture mount, flange profile. Arm & Leg: Woodland Grey, Eco Slats: Woodlike - Spotted Gum.
/
SWMH
Ph: (07) 3877 2856
/
110 109 10
4
/
10
5 105
/
Fence Type 1 (FEN-1) 1.8m solid timber fence. Refer to details drawing.
/
TE
/
110
Fence Type 2 (FEN-2)
/
111 field pit EPL
1.8m timber good neighbour fence. Refer to details drawing.
/
106
/
Fence Type 3 (FEN-3) 1.2m pool safety fencing. Refer to details drawing.
/
106
111
/
112
/
storstor
stormwater line
HC
Gates (GT-#) 800mm wide gate to match fence type to allow for maintenance access. Include key lock latch. All locks be keyed the same.
mmw
/
waaterteliner lin
/
Gates to be self closing
e
112
/
113 107
/
Rail Type 1 (RAIL-1) 1m high safety rail fixed to top of retaining wall refer to architects specification.
sewersewer
waterwater
fenceline
/
107
line
line
//
line
line
//
/
/
113
Bike Rack Type 1 Cora Bikerack SKU#: Expo 4506 - Stainless steel - Bike rack for 5 Bikes with base plate surface mount fix. Bolt down installation as per
CD-101
/
28
(BR1) Ph: 1800 249 878
/
114
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
SP
176
968
manufacturers recommendations with anti-vandal fixings.
sewer line
sewer line
Retractable Hose Reel Hoselink 20m Retractable Hose Reel. Colour - 'Beige'. Install on 700mm height 100 x 100 H4 HW timber posts with hosecock connection.
111
110
109
113
112
11
10
8 and Hose Connection Ph: 1300 900 617 Ease all edges on post and apply protective timber coating.
CD-201
4
108
(HC)
115
116
Retaining Wall Type 5 Low landscape stacked boulder retaining wall, Max 800mm height integrated into landscape batter. Weathered igneous stone
(RW05) boulders without sharp edges, embed 1/4 of boulder below lower finished level. Back wall will geofabric, AG drainage and
drainage gravel. Connect AG drainage to stormwater.
117
109
Retaining Wall Types Custom Retaining Concrete Sleeper Retaining wall to engineers construction details. Use Timber Rustic Charcoal Concrete Sleepers from custom
116
2 & 3 (RW02, RW03) Solutions 0499 579 232 retaining solutions. Nominal size 1600mm length - confirm with engineering drawings.
CONTEXT PLAN
Retaining Wall Type 8 Masonry block retaining wall as per engineering drawings. Refer to Architectural finishes for BW-Rdr1.
(RW08)
Retaining Wall Type 1 Masonry block retaining wall and concrete sleeper retaining wall as per engineering drawings. For masonry wall refer to
(RW01) Architectural finishes for BW-Rdr1. For concrete sleeper wall match with RW02 & RW03
Retaining Wall Type 4 Grouted rock retaining wall per engineers drawings. Use local sunshine coast igneous rock. Provide sample for approval.
(RW04)
Pavement Type 1 (P1) 75mm thick compacted decomposed granite with 5% cement on 100m thick compacted crusher dust. Refer to details.
CONSTRUCTION HOLD POINTS
Landscape contractor is responsible for notifying Landscape Architect and arranging for progress inspections
of the landscape at the following hold points. Failure to do so will result in Project Urban being unable to certify Pavement Type 2 (P2) Littlehampton Clay Bricks Blush Paver Standard Size 230mmx114mm 50mm thick clay brick paver. Lay in herringbone pattern with Sailor Course edge set
completed works and may result in reworking to be undertaken at the contractor's expense. and Pavers on concrete haunch. Refer to details.
Ph: 1300911855
Hold Point 1 - Pre-Start Meeting Pavement Type 3 (P3) Cordwells 5446 7204 Cordwells Low-Carbon concrete pathway, broom finish colour concrete. Colour Ginger
Hold Point 2 - Preparation of subgrade, tree holes & drainage
Hold Point 3 - Review of placement and shaping of topsoil
Hold Point 4 - Review of advance tree stock - on site or in nursery prior to planting Pavement Type 4 (P4) Cordwells 5446 7204 Proposed driveway. Cordwells Low-Carbon Concrete plain grey driveway. Refer engineers drawings.
Hold Point 5 - Initial setout of containerised plant stock
Bollard Light (BL) 600mm Height External Bollard Light. Refer to architects specification. Locate at nominal 4m centres and at top and bottom of
Where irrigation is specified the following hold points are required external stairs. Confirm locations with Landscape Architect prior to running conduits.
Hold Point 6 - Set out of irrigation dripline prior to mulching garden beds
CERTIFICATIONS & RECEIPTS
Landscape contractor is responsible for providing certifications as required in the specification notes and to
provide receipts to confirm delivery of specified materials. Typically, this will include the following.
· Site Soil Test Report and amelioration recommendations
· Receipts for soil conditioners and ameliorants
· AS4419 Certification for imported topsoil
· Receipts for podium soil supply
· AS2303 Certification for advanced tree stock
Revision Date Amendment Drawn Checked
TENDER ONLY
COVER SHEET NOT FOR CONSTRUCTION
A
B
10.04.2026
23.04.2026
For Tender
For Tender
XL
CS
CS
CS
CD-000 scale: 1:400@A1; 1:800@A3
62 LAKE MACDONALD DRIVE, COOROY
H
RT
NO
JOB NUMBER: 24228 CLIENT NAME: COAST2BAY HOUSING GROUP
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Landscape Plans.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of pages 2 to 7 (of 10)
Page 2
14. Bio-Basin
LANDSCAPE NOTES 10. Containerised Plant Material - Supply and Installation Bio Basin filter media to contain 5% organic matter to support plant growth as per Water by Design Guidelines. Provide filter
EXTENT OF WORKS All planting is to be carried out in a manner consistent with good horticultural practice. All plant stock is to be in accordance with the scheduled media test results to confirm organic content. Plant Macrophytes with pre-soaked water retentive material such as coir and slow
nomenclature, well formed, hardened off nursery stock. They are to be container grown in potting mixture with a healthy root system and not release plant starter fertiliser. In the absence of regular rainfall, ensure basins are watered twice weekly through a 3 month
Contractor shall allow to carry out items of landscaping as detailed on the Landscape Plans listed on 24228 Cover Sheet CD-000. pot bound. All pots shall be free of weeds and plant stock is to be free from living insects, pests and disease. All plants are to be fully sun or
establishment period.
Contractor to ensure they have the latest issue of the documents prior to tendering and construction. Contractor should also shade hardened-off to suit their on-site growing position for a minimum period of 6 weeks. Contractor shall be responsible for replacing failed
take full account of documentation of Architectural, Civil Engineering, Hydraulic Engineering and Electrical Engineering works plant stock within the 12 month maintenance period. It is therefore recommended that the Contractor does not accept below Standard stock 15. Services
which will be made available on site. Hard surface layout is to be at the discretion of the Project Manager. Where there is from the Nursery/Supplier. The location of all underground or overhead services shown on these drawings are indicative only. They have been incorporated
conflicting information, contact the Landscape Architect. Landscape works for this contract are to include the following: at the design or Council Approval stage for general information. The Landscape Contractor shall be responsible for liaising with
Ensure sufficient supply of each species shown on the drawings is available to achieve the required layout and densities, and in the event of the Principal Contractor to determine where the 'As Constructed' location of all water, sewer, stormwater, electrical,
1. Co-ordination with Other Trades and Conduit Installation supply for replacement stock due to failure, damage, unhealthy specimens or theft. Prior to plant stock arriving to site, a Nursery inspection communication or other existing services before commencing any excavation works.
2. Removal of Debris including the Landscape Architect and Landscape Contractor is required. The plant supplier is to ensure all stock (or good selection of stock) is
3. Sediment and Erosion Control present during the inspection. It is also recommended that the Landscape Architect is on site to inspect plant stock and plant set out prior to 16. Inspection Plan & Shop Drawing Review
4. Excavation and Drainage of Planting Areas planting. The Contractor shall co-ordinate the following inspections with the site superintendent:
5. Topsoil - Supply and Incorporation - "Pre-start" - prior to commencement of works, for setout approval and construction timetable
6. Soil Amendments Plant stock notes: confirmation.
7. Edging to Planting Areas - where not already supplied - Container sizes are noted as follows:- - Excavation inspection - at completion of excavation and drainage works and prior to topsoil addition.
8. Shaping of Garden Areas - Pots in millimetres. - Pre-planting inspection - at commencement of placement of advanced plant material.
9. Fences - Bags in litres. - Setout inspection - at first setout of containerised plant stock.
10. Containerised Plant Material - Supply and Installation - Stock may be rejected if plants are:- - "On Maintenance" - at practical completion.
11. Street Tree Planting Location Notes -- Undersized proportional to specified container size or if the root system is underdeveloped. - "Off Maintenance" - 365 days after practical completion.
12. Garden Mulch - Supply and Spread -- Oversized proportional to specified container size or severely root bound.
13. Turf - Supply and Lay -- Unbalanced or uncharacteristic of normal or specified growth pattern for the species. Contractor to provide shop drawings and structural design certification for review and approval of any custom designed
14. Bio-basin -- Not suitably acclimatised for the specific environment. structures, furniture or fencing.
15. Services -- Diseased, infested with pests or suffering from other form of significant stress.
16. Inspection Plan & Shop Drawing Review -- Have poor root development or root defects. 17. As Constructed Requirements
17. As Constructed Requirements - Substitution of specified plant species only by written instruction from Landscape Architect. The Landscape Contractor is to clearly mark up and provide the Landscape Architect any changes to the built landscape from the
18. Maintenance of Landscape Works (12 months)
issued construction drawings. As Constructed information is to include dimensions, materials and depths which vary from and/or
19. Landscape Carbon Emissions Implementation notes: are not included on the construction issue plans. Contributed Landscape Assets are to be captured and included in the ADAC
20. Podium Soils Ensure all planting procedures result in healthy plant species within the prevailing soil, climatic and management environment of this project. survey for the development as per the Sunshine Coast Council As Constructed Data Standards and Guidelines. The Landscape
The following minimum is expected: Contractor is to coordinate asset capture with the Project Surveyor and allow for hold points accordingly, especially with
1. Co-ordination with Other Trades - Excavate a hole for each plant twice the diameter of the rootball and 100mm deeper than the root ball. Break up the base of the hole to a underground services. Landscape contractor is to provide the following documentation as relevant:
Contractor is to make full allowance for the reasonable activities of other trades. Where directed by the Principal Contractor all
further depth of 100mm and loosen the sides of the hole. - Certification that all street trees comply with AS2303:2018.
must comply with soil and erosion control measures. Contractor shall allow for the installation of electrical services for - Remove the plant from the container with minimum disturbance to the root ball, place in final position, ensure it is central - Contractor to provide MDS or Product Data Sheet of any proprietary furniture or structural items.
landscape lighting at the appropriate time in the construction program. Contractor shall pay due consideration to installation of
and plumb. Ensure the root ball is level with the finished surface of the soil surrounding the hole or bed. - Certification of supplied topsoil to AS4419
irrigation lines so as to minimise disturbance to planted areas. The coordination of appropriate conduit lines forms part of this - Ensure correct placement of fertiliser requirements such as Nutri-Tech Solutions 'Life-Force Gold' + Life Force Carbon is - For amended site topsoil provide delivery dockets of ameliorant to confirm quantities supplied.
contract. Contractor shall take due care with any machinery to site. Particular care is to be taken with newly poured concrete
ameliorated into existing or imported topsoil and that any water retention additive and the above fertilisers are installed as per the
curbing and with newly laid A.C. road surfacing. Any damage to existing structures or services will be rectified at the contractors
manufactures specification. 18. Maintenance of Landscape Works
expense. Any disputes will be settled by the site Superintendent.
- Thoroughly water plants immediately after planting with sea change KFF and at such times during the contract period The Maintenance Period commences at the date of Practical Completion of Works. During the Establishment Period maintain best
as required. All large stock will require a minimum of 10ltrs of water and smaller stock 5ltrs of water at the time of planting. horticultural practices including (but not limited to) the following items where required: watering, weeding, fertilising, pest and
2. Removal of Debris
- Backfill with topsoil as specified. Lightly tamp and water thoroughly to eliminate any air pockets. Ensure that disease control, mulching, pruning, rubbish removal and keeping the site neat and tidy. Rectify defects that become apparent in
Site is to be cleared and is to remain clear of any deleterious material prior to commencement and throughout construction of
topsoil is not placed over the top of the rootball. the works under normal use.
landscape works. Planting areas are to contain planting and selected drainage materials only and are not to contain any
building material waste.
All advanced trees 25L or greater are to be certified as AS2303 compliant. Contractor to sight and supply certification to superintendent The Landscape Contractor is to allow for topping up mulch, rectifying defects, top dressing sunken edges, replacing failed or
prior to accepting trees from the nursery. Contractor is to review all tree stock at unloading and prior to planting to ensure the compliance with under-performing plant stock at the end of the Maintenance Period. All Council controlled works to be inclusive of a twelve (12)
3. Sediment and Erosion Control
the below. Trees that fail these criteria should not be planted and are to be returned to nursery month maintenance program.
Where directed by the Principal Contractor all must comply with soil and erosion control measures. Refer Civil Engineers
- Roots should be of good form and free from circling, girdling, J-rooting or other defects/abnormalities. Contractor
drawings for all sediment and erosion control measures.
to tease out roots and prune as required to encourage healthy root development. Maintenance and Inspection Program:
- Trees are to be self supporting, of good form and health with single undamaged leader, no bifurcations or bark inclusions. Responsibility Weeks after practical completion Maintenance Inspection Frequency
4. Excavation and Drainage of Planting Areas
- Ensure trunk is not buried below flare in trunk at top of roots, contractor to scrape off excess potting mix as required. Contractor 0-2 3 per week
Break up and remove any asphalt, roadbase material or excess concrete slurry from kerbing works to achieve required planting
Contractor 3-4 2 per week
depths. Excavate site soil as required to ensure consistent high quality planting material. Break up existing subgrade to a depth
Collect all empty plant containers daily during planting operations, remove from site and return for nursery to re-use. Do not vary the plant Contractor 5 - 13 1 per week
of 300mm. Any excavated planting areas are to be scarified at sides to provide anchorage for future root development.
locations from those specified on the drawings unless otherwise directed by the Superintendent. Should it be necessary to vary the locations and Contractor 14 - onwards As per established maintenance regime
Additional excavation works will be required in areas of advanced plant material. Drainage is to be incorporated to all planting
spacing for any reason, immediately apply for directions by the Superintendent. Replace failed or damaged plants. This does not include
areas that are enclosed by hard edging and not otherwise drained. Contractor should allow for drainage to all garden areas.
vandalised or stolen plant material - this will be replaced prior to practical completion. Trees are to be planted 20-30mm above finish level to Maintenance Program General Notes
allow for settling. - Maintenance inspection frequencies are minimum.
5. Topsoil - Supply and Incorporation
- Monitor plant performance and stress constantly and take appropriate remedial action. Soil moisture
All soils are to comply with AS 4419 Table 1 (both site topsoil and imported topsoil)
11. Street Tree Planting Location Notes. levels are critical during early establishment. Avoid over irrigating planting areas.
Topsoil for garden areas should be a minimum 300mm depth. Where available maximise the use of soil from on site. Site topsoil
Locate road verge street trees in accordance with Local Authority Requirements or as indicated below: - Mow turf every 2 weeks.
shall be screened to break up clumps, remove unwanted material and ensure soil is easy to work. Screening to take place within
- Minimum 2.0 metres from driveway cross over. - Prune and shape all shrubs and trees on a monthly basis as required.
2 weeks of requiring soil for use. Top soils are to be tested for horticultural suitability and receive appropriate amelioration if
- A minimum of 1.0 metre from all services to prevent root/service conflict and to provide future ease of maintenance requirements. - Remove all stakes at 90 day inspection, or after satisfactory establishment.
required. All topsoil must be free from noxious weeds, rocks, roots, nut grass, rubbish or any other deleterious material.
- A minimum of 2.0 metres from stormwater pit. - Fertilise all garden beds and street trees at 3 monthly intervals.
Place all topsoil in the areas directed and specified. Ensure that the topsoil is spread and graded evenly to prevent any ponding.
- A minimum of 4.0 metres from street lights. - Contractor shall maintain an up to date written log book to record inspection observations and actions.
Prevent excess compaction by construction plant. Stripped site topsoil needs to be stored in piles no greater than 2m high x 3m
- A minimum of 750mm behind the kerb or centrally if between footpath and back of kerb.. - The log will be made available to the site superintendent, upon request, at any time for examination.
wide. Topsoil storage piles for storage greater than 4 months should be seeded with a suitable grass mix and screened prior to
use. Eradicate weeds using environmentally acceptable methods. Project Urban discourages the use of Glyphosate and is happy 19. Landscape Carbon Emissions
12. Garden Mulch - Supply and Spread
to discuss alternative options with the Landscape Contractor. Noxious weeds need to be screened out of the topsoil prior to Reduction of greenhouse gasses created during the construction or maintenance of the landscape works and embodied
All mulch is to be free of deleterious or extraneous matter such as soil, weeds, rocks, and twigs. The finish level of the mulch is to be level with
placement. greenhouse gasses in materials is strongly encouraged. Contractors are to provide a written statement outlining carbon reduction
the finish level of all adjacent surfaces after settlement allowances of the topsoil and mulch. Ensure all mulch is placed clear of plant stems to
avoid rotting at ground level. Mulch is to be coarse chipped forest mulch (a combination of wood, leaves and bark) with no more than 10% fines measures adopted by their business which are applicable to this project. These could include items such as the following:
6. Soil Amendments
nominal 25-50mm size or approved equal. Mulch shall be to a predominant depth of 100mm as described above. Mulch is to be formed to avoid · Use of electric powered equipment for construction and maintenance
The Contractor shall allow to amend the garden and podium soil with the following components, to be confirmed by soils test:
placement against green plant stems and overflow from purpose formed edges, kerbs and pathways. Samples of all mulch types to be provided · Use of electric or hybrid vehicles or fleet for transportation and construction
- Nutri-Tech Solutions 'Life Force Carbon' - Spread a 3 - 5 mm layer of Life Force® Carbon™ over garden beds. Work into
to Landscape Architect for approval prior to installation. · Purchase of power from sustainable sources or production of own power through Solar PV cells
the top 10- 15 cm of soil where practical and water in well. Apply 2-3 times a year for best results. Planting New Trees: 1 -
· Use of organic fertilisers rather than petrochemical products
2 cups per tree in the hole.
13. Turf - Supply and Lay · Use of low carbon concrete or materials fabricated through low carbon supply chains
- Nutri-Tech Solutions 'Life Force Gold' - For Landscapes - 200 g (or 1 cup) per square metre and for Podium Media - 15
Obtain turf from a specialist grower of cultivated turf. · Use of local materials with low transport carbon costs.
grams per litre
Turf notes: · Offsetting greenhouse gas emissions through accredited offset schemes
- "A" Grade turf as per Material Schedule with a minimum sod depth of 25 mm
7. Edging to Planting Areas- where not already supplied
- Turf to be laid within 24 hours of being cut and on day of delivery. Project Urban is in the process of reviewing products that we specify to favour the use of low embodied greenhouse gas
All planting areas adjoining turf are to be edged as specified on the landscape plans or detail sheets. Edging should finish flush
- Grade turf areas evenly with falls to drains. emissions materials. Contractors should review materials schedules and ensure their pricing reflects the specified materials.
with adjoining finished levels and hard pavements. Round / Ease all edges where applicable.
- Allow for ground preparation and placement of 100mm topsoil to specification requirements. Substitutions of materials should consider the embodied greenhouse gas in those materials. We are happy to consider alternative
- Apply 'turf starter' fertiliser prior to laying (as per Manufacturer's specifications). lower carbon footprint products suggested by the contractor.
8. Shaping of Garden Areas
- Lay turf parallel to slope contours with staggered, close-butted joints so that the finished turf surface is flush with
Planting areas are to be finished in a well mounded fashion to facilitate drainage of excess water and to show planting to best
adjacent finished surfaces.
advantage. Mounds to be generally of 1:3 max and 1:5 minimum at time of practical completion.
- Turf to be laid 10mm proud of adjoining surfaces to allow for settling of topsoil and to ensure there is a flush finish at at
9. Fences the end of the maintenance period.
All fences and footings to be located within private property where applicable. Fencing to common boundaries are to be - Water in well and roll after laying to remove undulations - ensure all joins are gap-free. Top-dress any gaps or
located on the boundary line as determined by a registered surveyor. Refer to Fencing notes and specification. Where new undulations with coarse washed sand.
fences are indicated on the drawings, existing fences are to be demolished, unless otherwise noted. - Keep lawn moist until established and rooted in. Install temporary barriers (flagging tape) to ensure walking and driving on turf areas is
prevented and avoided.
- Replace failed turf and relay with new turf.
Revision Date Amendment Drawn Checked
SPECIFICATION NOTES TENDER ONLY
NOT FOR CONSTRUCTION
A 17.04.2026 For Tender XL CS
CD-001 scale: N/A
62 LAKE MACDONALD DRIVE, COOROY
JOB NUMBER: 24228 CLIENT NAME: COAST2BAY HOUSING GROUP
Page 3
LANDSCAPE NOTES PLANTING SCHEDULE
20. Podium Soils
Lightweight podium soil mix shall be supplied and installed by the Contractor to
planters and podium areas to locations shown on plans.
The soil mix shall be:
i. Free from perennial weeds and their roots, bulbs or rhizomes.
ii. Free from building rubble, including bricks, concrete, plaster, timber, oil or any
other matter deleterious to plant growth.
iii. Free from rocks or stones greater than 8mm diameter, but in any case, to have
less than 15% stone by dry weight.
iv. To have all components batch blended evenly throughout and have a pH range
of 6.0 - 7.0 (i.e., slightly acid to neutral).
v. To have a light to medium friable loam texture.
vi. Free from Silt Material.
vii.Conducive to the establishment and maintenance of healthy, thriving plants.
vij.Initial fertiliser application - 150gm/m2 of Osmocote Low P - 12-14 months and
annual fertiliser application of 75gm/m2 of the same product.
The podium soil mix to above ground planters shall be Hydrocell 40 Extensive
Lightweight Soil / Podium Mix, compaction of media at 100mm increments with
equivalent force to an average persons footprint. Comprising 30% Washed Sand,
40% Hydrocell, 20% 14mm scoria and 10% Composted Organics by volume. Supplier
Fytogreen Australia Tel - 1300 182 341.
The planter mix to planters shall be Hydrocell 40 Extensive Lightweight Soil / Podium
Mix comprising 30% Washed Sand, 40% Hydrocell, 20% 14mm scoria and 10%
Composted Organics by volume. Supplier Fytogreen Australia Tel - 1300 182 341
The Contractor may offer an alternative soil mix based on previous experience. Full
details of such mix including situations of use elsewhere shall be submitted to the
Superintendent for consideration. The Superintendent shall provide written approval
or otherwise to the Contractor prior to the Contractor ordering soil mix.
Revision Date Amendment Drawn Checked
SPECIFICATION NOTES & PLANTING SCHEDULE TENDER ONLY
NOT FOR CONSTRUCTION
A
B
17.04.2026
23.04.2026
For Tender
For Tender
XL
CS
CS
CS
CD-002 scale: N/A
62 LAKE MACDONALD DRIVE, COOROY
JOB NUMBER: 24228 CLIENT NAME: COAST2BAY HOUSING GROUP
Page 4
fieldpit
nc . p ath
co
LEGEND
SURFACE FINISHES
EP #96905 T1 - TURF TYPE 1
T1
103 T2
T2 - TURF TYPE 2
GB1 - Garden Type 1
GB1 General Gardens Typical
EG-1 GB1
EG-1 GB2 - Garden Type 2
GB2 Podium Planter
GB3
104 GB3
GB3 - Garden Type 3
BL
10
GB3 Stormwater Easement
4
GB1 GB1 BL
HC Edge Type 1
BL EG-1 Refer to detail
BL EG- BL
1
EG- V-1 1 GB1 Wicking Beds Type 1
105 BL V-1 Round Garden Bed
V-2 P1 V-2 P5 900
P1 P2 BL Wicking Beds Type 2
BL BL BL BL BL BL V-2 Oval Garden Bed
S1 S1 V-1 BL
RW05 Community Stormwater S1 Seating Type 1
BL BL BL Refer to Materials
BL treatment device S1
RW
GB1 GB1 & Finishes Schedule
08
RW05 RW05
FEN-3 FEN-3 FEN-3 Landscape Retaining Wall
106 RW04 RW04 BL Refer Schedule and Details
/
RW0#
//
//
GB1 GB1 GB1 GB1 GB1 GB1 GB1
//
RW0#
/
//
//
//
Structural Retaining Walls
FEN-1
RW
FEN-2
FEN-2
FEN-2
//
//
FEN-2
/
FEN-2
FEN-2
FEN-2
EG-1 EG-1 EG-1 EG-1 EG-1 EG-1 Refer Engineer
//
//
//
EG-1
/
//
//
P2
//
//
//
HC Hose Cock
/
//
//
//
HC Refer to Materials
/
//
T1 T1 T1 T1 T1 T1 T1
//
//
//
//
& Finishes Schedule
/
//
10
RAIL-1
//
//
/
//
//
Paving Type 1
//
4
BL
//
//
//
/
P1 River Pebble
//
//
/
//
//
//
GB1
//
P3
//
//
/
Paving Type 2
//
//
/
//
//
//
//
P2 P2 Clay Brick Pavers
/
/
//
FEN-2
103
//
//
//
/
Paving Type 3
RW01
/
//
Refer to Materials
//
107 P3
//
//
/
& Finishes Schedule
/
Paving Type 4
//
/
P4 Refer to Materials
/
& Finishes Schedule
/
FEN-1
/
FEN-1 1.8m Solid Timber Fence
/
/ / /
104
/
/
FEN-2 FEN-2
RAIL-1
/
1.8m Timber Good Neighbour Fence
EG
//
/
-1
/
FEN-3
/
FEN-3 1.2m Pool Safety Fence
/
GB1
/
/
RAIL-1 RAIL 1
108
/
1m High Safety Rail
/
-1
Refer to Architects Drawings
EG
/
T2 Gate - varies
/
GT-#
/ / /
Gate to match fence type
/
P2
RW0
P3 P3 P3 P3 P5 Refer to Schedule
/
P2 BOL#2
/
1
Bollard Light 600mmH
/
HC BL Refer Architectural Plans
/
BR
GB1
/
GB1 GB1
1
/
RAIL-
P3
/
/
GB1
/
/ /
P3
/
109
/
/
/
GB1 T2
/
10
/
5
EG-1
/
RW02
/
/
P4
/
/
/
JOINS CD-101
Revision Date Amendment Drawn Checked
TENDER ONLY
SURFACE FINISHES PLAN - GROUND FLOOR NOT FOR CONSTRUCTION
A
B
17.04.2026
23.04.2026
For Tender
For Tender
XL
CS
CS
CS
CD-100 scale: 1:100@A1; 1:200@A3
62 LAKE MACDONALD DRIVE, COOROY
H
RT
NO
JOB NUMBER: 24228 CLIENT NAME: COAST2BAY HOUSING GROUP
Page 5
LEGEND
SURFACE FINISHES
/
JOINS CD-100 T1
T1 - TURF TYPE 1
T2 - TURF TYPE 2
/
T2
/
/
GB1 - Garden Type 1
/
FEN-1
GB1 General Gardens Typical
/
/
/
GB2 - Garden Type 2
/
GB2 Podium Planter
/
/
GB3 - Garden Type 3
/
GB1 GB3 Stormwater Easement
/
/
Edge Type 1
/
EG-1 Refer to detail
/
/
/
Wicking Beds Type 1
/
V-1 Round Garden Bed
/
/
RW01
Wicking Beds Type 2
/
V-2 Oval Garden Bed
/
/
/
S1 Seating Type 1
/
Refer to Materials
GB2 GB2 S1
/
GB2 & Finishes Schedule
/
RW05 RW05
/
Landscape Retaining Wall
/
Refer Schedule and Details
/
RW0#
/
RW0#
Structural Retaining Walls
/
RW
Refer Engineer
/
/
HC Hose Cock
/
HC Refer to Materials
/
& Finishes Schedule
/
Paving Type 1
/
P1 River Pebble
/
GB3
/
GB2
FEN-1 /
Paving Type 2
/
P2 Clay Brick Pavers
/
/
GB2 RW01 Paving Type 3
/
P3 Refer to Materials
/
& Finishes Schedule
/
Paving Type 4
/
P4 Refer to Materials
/
& Finishes Schedule
/
/
FEN-1 FEN-1
/
/ / /
1.8m Solid Timber Fence
/
/
FEN-2
/
FEN-2 1.8m Timber Good Neighbour Fence
/
//
/
/
RW01 FEN-3 FEN-3
stormwa
RW03
RW02
RAIL-1
/
1.2m Pool Safety Fence
/
/
P3 RAIL 1
ter line
RAIL-1
/
1m High Safety Rail
/
Refer to Architects Drawings
/
Gate - varies
/
T2 GT-# Gate to match fence type
/
FEN-2
/ / /
Refer to Schedule
/
//
/
BOL#2
/
BL Bollard Light 600mmH
/
T2 GB2 GB2 Refer Architectural Plans
/
/
/
//
T2
FEN-2
/
EG-1
EG-1
T2
GB1
T2
GB1
RW
/
//
//
0
sewer line
water line
2
/
FEN-2
EG-1 EG-1 STEP FENCES OVER
/
//
//
FEN-2
GB1 GB1
/
RETAINING WALL.
T2
//
/
//
//
RW RW02 RAKE TRANSITION
FEN-1
03
/
//
RAI EG-1 P3
//
/
//
//
L-1 GB1
FEN-2
/
//
GB1 GB1
//
/
GB1
//
//
RW03
FEN-3 FEN-2
T2
/
//
P3
//
EG-1
/
RAIL-1 RAIL-1
/
/
/
FEN-3
GB3
GT-3
GT-3
FEN-1
GT-1
GB3
/
/
GB1
/
/
/
/
/ / / / / / / / / / / / / / / / / / / / / / / / / / /
/
/ / / / / / / / / / / / / / / / / / / / / / / / /
FEN-1
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
FEN-1
/ / / / / / / / / / / / / / / / / / / / /
FEN-1
sewer line
Revision Date Amendment Drawn Checked
SURFACE FINISHES PLAN - FIRST FLOOR TENDER ONLY
NOT FOR CONSTRUCTION
A
B
17.04.2026
23.04.2026
For Tender
For Tender
XL
CS
CS
CS
CD-101 scale: 1:100@A1; 1:200@A3
62 LAKE MACDONALD DRIVE, COOROY
H
RT
NO
JOB NUMBER: 24228 CLIENT NAME: COAST2BAY HOUSING GROUP
[OCR of page images]
JOINS CD-100
FEN-1
;
z
|g
le
:
|
=
“rg a) §
| uo = \ \ g
Fa est eae — ~~ STEP FENCES OVER a g
© © RETAINING WALL. » @ a
Tl RAKE TRANSITION -
Gi : &G- =
SOK ee oe eS RWO KK Oo ne ee oe se en VOL Le JGB1L —_-§_ G,—— {GB SS SS SS
i a | | eS a a: a | a ai (72)
ae SS Yb CR eee ee OS SSOSt
1rd — 11 1 2 Ch a A a a 8 a
FEN-1
Le
ow sewer line
Revision Date Amendment Drawn Checked
TENDER ONLY A 17.04.2026 For Tender XL cs
- NOT FOR CONSTRUCTION B 23.04.2026 For Tender cs cs
CD-101 scale: 1:100@A1; 1:200@A3
62 LAKE MACDONALD DRIVE, COOROY :
JOB NUMBER: 24228 CLIENT NAME: COAST2BAY HOUSING GROUP N77
LEGEND
SURFACE FINISHES
V-2
|
SI
RWOS
RWO#
RW
@® HC
[ P1
© BL
PROJECT &
URBAN \¥
T1 - TURF TYPE 1
T2 - TURF TYPE 2
GB1 - Garden Type 1
General Gardens Typical
GB2 - Garden Type 2
Podium Planter
GB3 - Garden Type 3
Stormwater Easement
Edge Type 1
Refer to'detail
Wicking Beds Type 1
Round Garden be
Wicking Beds Type 2
Oval Garden B ed
S1 Seating Type 1
Refer to Materials
& Finishes Schedule
RWO5
Landscape Retaining Wall
Refer Schedule and Details
RWO#
Structural Retaining Walls
Refer Engineer
HC Hose Cock
Refer to Materials
& Finishes Schedule
Paving Type 1
River Pebble
Paving Type 2
Clay Brick Pavers
Paving Type 3
Refer to Materials
& Finishes Schedule
Paving Type 4
Refer to Materials
& Finishes Schedule
FEN-1
1.8m Solid Timber Fence
FEN-2
1.8m Timber Good Neighbour Fence
FEN-3
1.2m Pool Safety Fence
RAIL 1
1m High Safety Rail
Refer to Architects Drawings
Gate - varies
Gate to match fence type
Refer to Schedule
BOL#2
Bollard Light 600mmH
Refer Architectural Plans
W: www.ProjectUrban.com.au
P: 07 5443 3844
E: [email protected]
Tenancy 1, Level 3, The George,
4 Maud Street, Maroochydore.
Page 6
pa th
conc.
LEGEND
PLANTING
EP #96905 GROUNDCOVERS/SHRUBS
3 MEL MQ 2 RAN fit
103
70 DIA cae 85 LOM TC 10 LOM VER 14 LOM VER
70 LOM SHA HEDGES
20 AUS dul 5 CAL LJ 27 LOM SHA 7 MEL MQ
8 ARA cun 20 CAL RR 4 BAN BC 1 GRE rob
8 MEL MQ 20 MET MQ 8 HOW SM 4 SYZ BC ACCENT SHRUBS
20 MEL thy 8 LOM SHA 6 COR RUB 4 BAN BC 5 GOO ova
12 WES NAR 18 LOM VER
5 CAL LJ 4 BAN BC 10 LOM SHA 6 COR NEG 12 LOM VER 5 LOM TC
14 CAL LJ GRASSES
4 HAR pen
15 XAN CD
104 5 CAL LJ
9 LOM VER TREES
12 LOM VER
10
10 DIA KA
5 CAL LJ
4
3 CAL LJ
8 LOM VER 4 MYO par
5 STE sin 6 HOW SM 8 LOM EB
105
900
3 WES AB 8 LOM EB 28 LOM EB
4 DIA KA 5 DIA KA 4 DIA KA 6 MEL CT
3 WES AB 10 MEL CT 16 BAB HSM
3 Dor exc 3 BAN BC 7 CAS CI
3 Dor exc
Community Stormwater
3 Dor exc 3 CAL SLI
12 CAL GBF 6 DIA KA 2 STE sin 6 CAL LJ 7 XAN LP 9 LOM VER 9 LOM EB
24 HERBS 3 STE sin 20 LOM VER
treatment device
6 PHI XAN 30 LOM EB 10 CAL GBF 9 LOM EB 9 LOM VER
12 DIA cae 9 LOM EB
10 FIC pum
4 WES NAR
10 LIR JR 106
6 CAL LJ
/
//
//
//
/
//
//
7 MYO par
//
//
//
4 HYM fla
/
//
3 CAL SLI
//
//
1 MIC COC
/
//
//
//
7 LOM TC
//
//
/
//
4 PHI XAN 3 MET FF 3 MET FF 3 MET FF 3 MET FF 3 MET FF 3 XAN CD
//
//
12 DIC SF
/
//
//
//
4 XAN CD 4 XAN LP 4 XAN LP 4 XAN LP
//
4 XAN CD 4 XAN CD 3 MET FF
//
/
//
10
12 WES AB
//
//
/
//
//
4 PHI XAN
//
4 PHI XAN 4 PHI XAN 4 PHI XAN 4 PHI XAN 4 PHI XAN 2 PHI XAN
4
//
//
4 LOM SHA
//
/
//
//
5 DIA cae 4 DIA cae 4 DIA cae 4 DIA cae 4 DIA cae 4 DIA cae 4 DIA cae 4 RAN fit
/
//
//
//
//
//
//
/
4 COR KIW 3 COR KIW 3 COR KIW 3 COR KIW 3 COR KIW 3 COR KIW 3 COR KIW
//
//
/
//
//
//
3 SYZ BC
//
1 RAN fit 1 RAN fit 1 RAN fit 1 RAN fit 1 RAN fit 1 RAN fit 1 RAN fit
/
103
4 GOO ova
/
//
//
5 DIA cae 5 DIA cae 5 DIA cae 5 DIA cae 5 DIA cae 5 DIA cae
//
6 DIA cae
//
/
5 DIA cae
107 4 COR NEG 4 COR RUB 4 COR RUB 4 COR RUB 4 COR NEG 4 COR NEG 5 COR RUB 4 FLI sch
/
//
//
//
//
6 CAS CI
/
3 RHA exc
/
//
10 DIA cae 4 JUN con
/
10 CAL LJ
/
10 LIR JR 2 ALP cae
/
14 DIA cae 6 MYO par 1 PLU obt
/
4 LOM SHA
104
/
5 JUN con 12 LOM TC
/
1 PLU obt
/
18 GOO ova
/
4 ALO bri 12 HOW SM
/
6 CAS CI 10 LOM VER
/
8 VIO hed
/
7 ALP cae
/
6 HEL RC 8 PHI XAN 6 HEL AND 1 ALP cae
/
1 CYA coo 7 ASP ela 9 LIR EC 9 LIR EC 9 LIR EC 1 ASP nid
/
6 HEL AND
108
/
6 LIR EC 5 COR RUB 9 LIR EG 4 ALP cae 4 ALP cae 8 PHI XAN 6 VIO hed
15 LIR EC
/
6 BLE ind 4 DIA cae 4 ALO bri 8 PHI XAN 8 ASP ela 6 HEL RC
/
2 ELA eum 2 ALO bri
/
6 LIR EG 3 ASP nid 9 LIR EG 8 ASP ela 9 LIR EG 8 COR RUB 3 ASP nid
8 LIR EG
/
4 ASP ela 4 VIO hed 4 ALP cae 4 ALO bri 10 DIA cae
/
4 PHI RC 2 ALO bri 4 VIO hed 8 JUN con
9 ALO bri
/
3 ANI DD
/
/
5 ASP nid 3 ANI DD
/
1 HAR pen
/
6 DIA cae
/
5 COR RUB 14 VIO hed
/
21 BLE ind
/
3 ALO bri 6 WES NAR
/
/
21 BLE ind 1 RAN fit
/
104 9ASP ela 9 LIR EC 6 LIR EC 6 MYO par
/
6 LIR EG 2 ALO bri 6 ASP ela 1 ELA eum 1 ELA eum 9 LIR EC
/
9 ALO bri 23 PHI XAN
/
9 LIR EC 9 LIR EC 15 LIR EC 1 ELA eum 4 FIC pum
10
/
8 HEL AND
1 CYA coo 6 BLE ind 12 HEL RC 6 BLE ind 4 DIA cae 5
/
1 SYZ hem
/
4 PHI XAN 4 PHI XAN 6 ASP ela 9 LIR EC
/
9 CAL LJ
9 LIR EG 1 CYA coo 9 LIR EG 4 PHI XAN
/
8 COR RUB
/
1 CYA coo 1 CYA coo
/
8 DIA cae
6 ASP ela
/
JOINS CD-201
Revision Date Amendment Drawn Checked
PLANTING PLAN - GROUND FLOOR TENDER ONLY
NOT FOR CONSTRUCTION
A
B
17.04.2026
23.04.2026
For Tender
For Tender
XL
CS
CS
CS
CD-200 scale: 1:100@A1; 1:200@A3
62 LAKE MACDONALD DRIVE, COOROY NO
RT
H
JOB NUMBER: 24228 CLIENT NAME: COAST2BAY HOUSING GROUP
Page 7
JOINS CD-200 LEGEND
PLANTING
/
GROUNDCOVERS/SHRUBS
/
/
/
/
HEDGES
/
6 SYZ CAS
/
/
5 JUN con
ACCENT SHRUBS
/
6 ALP cae
/
/
6 CAS CI
/
GRASSES
/
/
/
TREES
/
18 FES gla 10 FES gla
/
21 FES gla 4 CAL LJ 7 CAL LJ
/
4 ALP cae
/
9 SEN BC 5 MYO ell 3 CAL LJ 1 RAN fit 1 MIC COC
6 COR RUB
/
5 CAL LJ 1 MAG TB 6 MEL thy 3 STR reg 3 MEL MQ 5 MYO ell
/
6 DIA cae
/
1 MIC COC 1 RAN fit 1 MIC COC 6 VIO hed 6 VIO hed
3 CAS CI
/
6 WES GB 7 BAN BC 6 MYO ell 1 RAN fit 3 MEL MQ
/
/
9 DIC SF 5 BAN BC
/
6 MEL MQ 5 JUN con
/
5 DIC SF
/
5 JUN con 5 JUN con
9 MEL MQ
/
6 HYM lit 1 MIC COC
/
6 JUN con
/
5 MYO ell 1 RAN fit 6 TRI var
/
1 RAN fit
/
6 JUN con 1 MAG TB
/
8 CAS CI
5 RHA exc 9 SEN BC
/
/
6 SYZ CAS 5 SEN BC 9 DIC SF
/
9 CAS CI 6 CAS CI 5 SEN BC 10 PHI XAN 10 LIR ISA 9 CAS CI
/
/
24 FIC pum 8 CAS CI 8 DIC SF 5 MEL MQ 3 BAC cit 3 BAB HSM
/
6 CAL LJ
6 DIC SF 7 DIC SF 5 MYO ell 6 JUN con 4 DIC SF 6 DIC SF
/
/
5 MEL thy 5 DIC SF 1 ANI DD
/
4 DIC SF 3 XAN LP 5 BAN BC
/
/
4 BAB HSM 4 CAS CI
/
3 BAN BC 7 DIC SF
/
/
5 RHA exc 10 FES gla 6 WES GB
/
44 FIC pum 9 CAS CI 9 SEN BC
/
8 DIC SF
/
9 CAS CI
7 COR RUB
/
4 SEN BC
7 COR NEG
/
4 SEN BC 4 CAS CI 4 CAS CI
/
7 COR KIW
4 DIC SF
/
/
/
6 DIA cae
/
1 ANI DD
/
3 XAN LP
/
/
4 DIC SF
/
4 CAS CI
/
9 DIC SF 6 SEN BC
stormwa
/
5 SEN BC
3 SYZ CAS 3 MET LD
/
/
9 CAS CI 3 COR KIW
ter line
/
4 DIA cae
/
6 COR RUB 8 COR RUB
/
4 CAS CI
4 ALP cae
/
7 DIA cae 9 DIA cae
/
27 VIO hed 6 COR KIW 5 COR KIW
/
//
2 BAN BC
4 ASP nid
/
7 DIA cae 6 DIA cae
5 COR RUB 3 MET LD 5 CAS CI
/
2 PHI RC 2 ALP cae 2 RHA exc
/
4 RHA exc 6 DIA cae 4 SEN BC
4 ALP cae
/
18 VIO hed 4 ANI DD
6 JUN con 1 RHA exc 3 COR KIW
/
4 ALP nid
/
4 DIA cae 14 SEN BC
//
6 CAS CI
/
2 PHI RC 2 ALP cae 4 CAS CI
/
//
sewer line
water line
//
20 VIO hed
/
5 MET LD
/
4 RHA exc
//
//
10 SEN BC
/
//
3 ASP nid
/
//
//
2 BAN BC
/
//
9 BAB HSM
/
4 PHI RC 5 CAS CI
/
//
20 LOM SHA
/
3 SYZ CAS
/
//
//
/
1 AGA rob
/
/
/
/
/
/
/
/
/
/ / / / / / / / / / / / / / / / / / / / / / / / / / / 6 AGA ori
/
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
4 RHA exc
/
5 DIC SF
/
2 RHA exc 3 SYZ CAS
/ / / /
1 XAN chr
/ /
4 LOM TC
6 CAL SLI 10 JUN con 6 CAL EUR 5 CAS CI 6 CAL SLI 4 RHA exc 4 RHA exc 10 TRA var
8 DIA cae
120 LOM TC 3 SYZ CAS sewer line 5 JUN con 5 DIC SF 6 CAL EUR 27 LOM TC 6 CAL SLI 24 LOM TC
18 FIC nod 12 FIC nod 8 COR RUB
84 FIC nod 5 CAS CI 5 CAS CI 3 SYZ CAS 6 CAL SLI
18 LOM SHA
6 CAL EUR 5 JUN con 5 CAS CI
6 SYZ CAS
5 DIC SF
Revision Date Amendment Drawn Checked
PLANTING PLAN - FIRST FLOOR TENDER ONLY
NOT FOR CONSTRUCTION
A 17.04.2026 For Tender XL CS
CD-201 scale: 1:100@A1; 1:200@A3
62 LAKE MACDONALD DRIVE, COOROY
H
RT
NO
JOB NUMBER: 24228 CLIENT NAME: COAST2BAY HOUSING GROUP